Page 381 - Southlake FY20 Budget
P. 381

CIP

      UTILITY FUnD



           SPIN   Neigh-  bor-  hood  3           All                    11

            Comprehen-  sive Plan   Reference  Waste Water   System   Master Plan   #1-WWS14-   Tier 1  Water   System   Master Plan   #4-WWS4 -   Tier 1  Sustainability   Master Plan



           Project's   Impact to   Annual   Operating   Budget  $15,000  $25,000  $0



          Descrip-  tion of   Annual   Impact on   Operating   Budget  Increase in   preven-  tive and   corrective   mainte-  nance.  Increase in   preven-  tive and   corrective   mainte-  nance.  No ad-  ditional   cost after   repaint-  ing.


            FY 2020   Cumula-  tive  $2,150,000   $2,150,000             $2,150,000



                            $1,900,000                                   $1,500,000
              Total                               $10,000,000


             Beyond /   Unfunded  $0              $7,250,000             $1,500,000



              FY 2024       $0                    $2,250,000             $0


              FY 2023       $0                    $500,000               $0



              FY 2022       $1,200,000            $0                     $0



              FY 2021       $0                    $0                     $0


              FY 2020       $0                    $0                     $0



             Total Prior   Funding  $700,000      $0                     $0



                    Funding is requested for   engineering design and   construction to replace   existing 12-inch, 10-inch,   with 15-inch and 10-inch   lines in Basin N-12 and   N-12a along Dove Creek   Chapel Downs.  Funding is requested for   engineering design and   Consumer Price Index in-  estimate.  Funding is requested   to repaint the Florence   The paint on the water   tower is from the original   Though inspections have   identified minor deteriora-  tion on the interior,
              Description  and 8-inch interceptor lines   south of SH 114. This sewer  line crosses SH 114 to serve  the Milner Tract, Methodist  Hospital, Summerplace, and   construction of a 5.0 million  gallon ground storage tank  and pump at T.W. King Pump  Station #2. The completion  of this project will increase  water flow and pressure to  the north and east portions  of the City. Inflationary and   creases have been added to  funding request to account  for cost growth since





              Project Name  15-inch   Sewer line in   Basin N-12   and N-12a  Water System   Improve-  ments -- 5.0   MG Ground   Storage Tank   #2 at T.W.   King Pump   Station #2  Repainting of   the Florence   Elevated Stor-  age Tank




              Fund          Utility   Fund        Utility   Fund        Utility   Fund


              Project #     UF7                   UF8                    UF9




    380                                        www.CityofSouthlake.com
   376   377   378   379   380   381   382   383   384   385   386