Page 274 - NRH FY20 Approved Budget
P. 274
DEPARTMENT / DIVISION FUND
PUBLIC WORKS – STREET GENERAL
PROGRAM NAME
PREVENTIVE STREET MAINTENANCE
DESCRIPTION / MISSION
This program provides the city with an effective preventive street maintenance program to protect the public investment on all
public streets, thoroughfares and public ways within the City of North Richland Hills. This program consists of minor
reconstruction, resurfacing, overlaying, slurry sealing and patching of public streets to preserve and to extend the life of the
pavement. This program keeps the city from having higher street repair costs in the future by repairing the minor problems and
preventing them from becoming significant and more costly to repair.
GOALS
• To protect the investment in public streets by utilizing a Preventive Maintenance Program to ensure maximum street pavement
life. (Efficient Effective Transportation System)
• To increase the condition ratings of street pavement by utilizing a Pavement Management System. (Efficient Effective
Transportation System)
OBJECTIVES
• Resurface 5 lane miles of street pavement with a 2” thick hot-mix asphalt overlay.
• Resurface 6 lane miles of street pavement with a micro slurry seal application.
• Repair 186,000 square feet of deteriorated street pavement (including pothole patching).
• Crack seal 10 miles of street pavement.
2017-18 2018-19 2019-20
PERFORMANCE MEASURES ACTUAL REVISED ESTIMATED
Goal: Efficient and Effective Transportation System
# Of streets rated poor (0-55 with 0 as bad) 83 74 62
% Of street lane miles receiving preventive maintenance (as of
January 2017, 536 lane miles of street pavement) 9.80% 4.80% 5.00%
Budgeted fund (materials only) $1,000,000.00 $1,300,000.00 $1,300,000.00
Lane miles of street pavement overlaid with 2” hot-mix asphalt 8 miles 5 miles 6 miles
Lane miles of street pavement slurry sealed 9 miles 6 miles 9 miles
Lane miles of street pavement crack sealed 9 miles 10 miles 10 miles
Square feet of street pavement repaired 153,468 sq ft 121,457 sq ft 140,000 sq ft
Average overall condition rating of streets (0-100 with 100 as
excellent) 83 83 85
Goal: Efficient and Effective Delivery of City Services
# Of staff hours (2” hot-mix asphalt overlay) 1,450 hours 1,400 hours 1,500 hours
# Of skilled field labor employees assigned to program 15 15 15
# Of administrative staff assigned to program 3 3 3
% Of people who believe non-residential street conditions are
excellent or good* 69.00% 69.00% 70.00%
% of people who believe residential streets are excellent or good* 59.00% 59.00% 60.00%
Cost per lane mile of 2” hot-mix asphalt overlay (includes pavement
repair and curb/gutter repair) $263,710.00 $276,895.00 $290,739.00
Cost per lane mile of slurry seal $39,986.00 $41,985.00 $44,084.00
Material cost per square feet of pavement repaired $1.73 $1.81 $1.90
*Staff received these percentages from the 2018 Resident
Satisfaction Survey.
270