DEPARTMENT / DIVISION                                     FUND
         PUBLIC WORKS – STREET                                     GENERAL
         PROGRAM NAME
         CHANNEL CLEANING / DRAINAGE IMPROVEMENTS
                                                   DESCRIPTION / MISSION
          An annual program that consists of cleaning out sediment that has built up significantly throughout the years in some of the city’s
          earthen channels. This project also consists of repairing curb and gutter sections on streets that have standing water problems.


                                                           GOALS
          • To remove sediment and re-establish the flow capacity of earthen channels to meet the requirements of the city’s Flood Damage
           Protection Ordinance No. 2061.  (Safety and Security)
          • To maximize the street pavement life and improve drainage along public right-of-ways by repairing curb and gutters that have
           standing water problems.  (Efficient and Effective Transportation System)

                                                        OBJECTIVES
          • Maintain, mow and clean designated city owned drainage channels as scheduled in the Public Works Drainage Program.
          • Repair isolated curb and gutter sections that stand in water on various streets throughout the city.(Have 229 different location
           identified.)
          • Inspect 300 drainage inlets throughout the city. Clean and add, or repair damaged “No Dumping” markers on the drainage inlets.


                                                                       2017-18          2018-19         2019-20
                        PERFORMANCE MEASURES                           ACTUAL          REVISED        ESTIMATED
          Goal: Quality Development and Revitalization
           # Of city staff                                                    3.00             3.00            3.00
          Goal: Efficient and Effective Transportation System
           # Of streets with isolated standing water curb and gutters repaired
           by contractor                                                        20              35              35
           Total # complaints concerning standing water problems on streets     31              27              30
           Cost per mile for drainage channel mowing/cleaning by city staff  $4,034.52    $4,090.56       $4,136.36
          Goal: Safety and Security
           # Of drainage inlet inspection, cleaning, and marking by city staff  778            220             300
           Total # of mosquito spray requests                                   25              15              15
           Total # of request for channel cleaning/drainage improvements        18              12              15
           % Of earthen channels cleaned and mowed                         100.00%         100.00%         100.00%
           Budgeted CIP project funds to dredge/clean streams and to repair
           standing water problems on public streets using contractor services  $0.00   $100,000.00     $100,000.00
           Miles of earthen drainage channels cleaned/mowed/maintained by
           city staff                                                      25 miles        25 miles         25 miles
          Goal: Efficient and Effective Delivery of City Services
           General operating expenses to mow and clean drainage streams by
           city staff (salaries, equipment, fuel and materials)          $75,863.00      $77,264.00      $78,409.00