Page 249 - Mansfieldr FY20 Approved Budget
P. 249

UTILITIES ADMINISTRATION

               MISSION STATEMENT:

               The mission of Utilities Administration is to direct the operations of the Utilities Division by maximizing
               the use of all available equipment, staff and assets to provide the citizens with “Superior” utility service
               that is second to none.

               Department at a Glance

               Utilities  Administration  is comprised of  the Administration Office, Billing  &  Collections, and Meter
               Reading  &  Repairs  departments.  It also includes GIS Services for city  staff and citizens.  The
               Administration budget increased 16.42% due to a merit increase and the addition of two positions. The
               Billing and Collections budget increased 0.5% due to a merit increase offset by reductions in contract
               services and collection agency expenses. The Meter Reading and Repairs budget increased 3.70% as a
               result of a merit increase, but less in capital funding than in FY 2018-2019.

               Key Goals and Objectives

               Goal 1
               Ensure a reliable source of water is available for Mansfield both now and into the future.

               Objectives:
                   •  Participate in regional water planning groups, including but not limited to, the Tarrant Regional
                       Water District, COG Water Resource Council, and Region C Water Planning Group.
                   •  Participate with the Trinity River Authority for the collection and treatment of the entire City’s
                       wastewater to ensure we are protecting the environment and downstream water supplies.
                   •  Monitor and adjust water conservation messaging and activities to ensure we are reducing per
                       capita consumption.

               Goal 2
               Retain and hire highly trained and qualified staff in every function within the division.

               Objectives:
                   •  Provide funding for the development and retention of advanced operator certifications.
                   •  Encourage participation in industry organizations to ensure the latest technologies and ideas are
                       evaluated and shared.
                   •  Provide  internal  and  external  training  opportunities  for  staff  in  safety,  operations,  and
                       management and leadership.

               Goal 3
               Ensure the financial  position of  the Utility  Division  is healthy and  capable of meeting the growing
               demands of the systems.

               Objectives:
                   •  Work with the Engineering Department to evaluate and develop the water and sewer CIP so that
                       it will meet both the needs of growth and aging infrastructure.
                   •  Evaluate and modify the rate model as needed to ensure we are capturing the required revenue for
                       the system.
                   •  Work with TRWD and TRA to stabilize system cost.


                                                                                                         249
   244   245   246   247   248   249   250   251   252   253   254