Page 119 - Haltom City FY20 Approved Budget
P. 119
City of Haltom City Annual Budget, FY 2020
Capital Projects Funds
Drainage Capital Fund (46)
During FY 2003-04, the City engaged consultants to perform a drainage study. The result
of the study was a plan that assesses a monthly fee to each residential customer in the
City. Commercial interests are billed a per square foot charge based upon the square
footage of their property multiplied by a runoff factor.
During FY2004-05, the City engaged another consulting firm to assist in the preparation
of a Drainage Master Plan. As a part of the analysis, floodplain maps were studied, and
the existing drainage system was studied. The results of the study determined that the
value of needed drainage projects amounted to approximately $102 million.
The FY2020 budget includes $1,795,609 for replacement of curb and gutter in conjunction
with street reconstruction and targeted areas in the City. Major projects approved for
FY2019 include:
Page 112