Page 119 - Haltom City FY20 Approved Budget
P. 119

City of Haltom City Annual Budget, FY 2020
                                                                               Capital Projects Funds




               Drainage Capital Fund (46)

               During FY 2003-04, the City engaged consultants to perform a drainage study.  The result
               of the study was a plan that assesses a monthly fee to each residential customer in the
               City.  Commercial interests are billed a per square foot charge based upon the square
               footage of their property multiplied by a runoff factor.

               During FY2004-05, the City engaged another consulting firm to assist in the preparation
               of a Drainage Master Plan.  As a part of the analysis, floodplain maps were studied, and
               the existing drainage system was studied.  The results of the study determined that the
               value of needed drainage projects amounted to approximately $102 million.

               The FY2020 budget includes $1,795,609 for replacement of curb and gutter in conjunction
               with street reconstruction and targeted areas in the  City. Major projects approved for
               FY2019 include:











































                                                           Page 112
   114   115   116   117   118   119   120   121   122   123   124