Capital Projects Funds
MAJOR CAPTIAL PROJECTS
Street Reconstruction Fund (31)
Street improvements are funded by sales tax revenues; bond proceeds, and transfers
from the Water and Sewer Fund to cover specific costs for utility replacements. Most
projects include the replacement of the sanitary sewer, water main, drainage, sidewalks
and replacement of the existing asphalt pavement with a concrete pavement. The
FY2020 budget for Street Reconstruction fund is $8,515,961. Major street projects for
FY2020 are listed below:
Major projects for Street Reconstruction Fund are described in more detail below:
Meacham Boulevard. Engineering will be completed February 2020. Construction
in summer FY2020.
Joy Lee (Earle to Dead End) and Swan (Joy Lee to Katrine). These streets are
combined into one project. This project also includes the replacement of the
existing asphalt street with a concrete pavement section, along with the
replacement of the existing sanitary sewer, water and drainage facilities. Project
was awarded FY2019. Construction began in FY2019. It is anticipated that will be
completed in FY2020.