Infrastructure
Goal 2: Support and Expand Programs to Reduce Environmental Impacts
Objective 1: Mitigate Operating Costs and Impact on Environment
Project Performance Measure(s) City Service Team (Department)
Core Mitigation of North Fleet Shared Services (AM)
INF Shop, 1015 W. Main St.
2.1.5
Summary: Estimated Actual
Objectives Completion Completion
In November 2015, a fuel release was detected from Conduct investigation, Oct. 2018 Oct. 2018
the on‐site aboveground storage tanks (ASTs).
including soil drillings and
According to City fuel inventory records,
optical subsurface imaging
approximately 317 gallons of diesel fuel was Completion of investigation Nov. 2018 Nov. 2018
released. The source of the release was determined to
report
be a broken product line. Emergency response actions Review Report Dec. 2018 Dec. 2018
were initiated to repair the line and abate the release
Recommendations and
and impacts to the nearby storm sewer. The City Develop Mitigation Plan
reported this event to the Texas Commission on Council Approval for Sept. 2019 Sept. 2019
Environmental Quality (TCEQ) and has been working
Contractor
with the state agency to monitor the property since. Area 2: Excavate (Former Fuel Nov. 2019
During this time, after several storm events, additional
UST) soil and contaminated
fuel product has been recovered from underground. water. Have contained soil
To minimize the risk of additional such events, the City hauled away.
is taking steps to mitigate the property.
Areas 3 & 4: Excavate soil and Dec. 2019
contaminated water. Find
Update: source of contamination Back
th
During the 4 quarter, mitigation project was bid and fill and Repave.
awarded to W2Plus. On September 24, City Council
approved the contract. W2Plus is scheduled to start Areas 5 & 6: Remove oil Tanks Jan. 2020
the mitigation project in early November. (UST) Excavate soil any
contaminated soil and repave