Page 216 - CityofEulessFY26AdoptedBudgetOrdinance2432
P. 216
City of Euless
Capital Project Request
March 21, 2024
Department: PUBLIC WORKS Date Prepared:
Submitted By: MAJOR JONES Date Completed:
Project Title: 50TH CDBG LINE REP— FAIR OAKS/ SHELMAR/ KENSINGER
Project Type: WASTEWATER Sub - Type: MAIN REPLACEMENT
Project Code: WW2401 Priority: A
COUNCIL AUTHORIZATION:
February 13, 2024: Conducted a Public Hearing for the proposed 50th year CDBG project and approved the
recommendation.
RELATIONSHIP TO OTHER PROJECTS AND/ OR MASTER PLAN:
The wastewater mains included in this project are part of the City' s Wastewater System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. Along Fair Oaks Boulevard from Lone Oak Circle to Ash Lane,
2. 302- 413 Shelmar Drive, and
3. Kensinger Court.
50th year CDBG project)
PROJECT SCHEDULE:
Began Design: October 2024
Design Complete: May 2025
Anticipate Begin Construction: August 2025
Anticipate Construction Complete: December 2025
JUSTIFICATION:
Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/ infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst -first approach to reduce maintenance costs and customer
problems.
Ordinance No. 2432, Page 210 of 474
56