Capital Project Request
March 27, 2024
Department: PUBLIC WORKS Date Prepared:
Submitted By: MAJOR JONES Date Completed:
Project Title: 51 ST CDBG LINE REPLACEMENT — MILAM DRIVE
Project Type: WASTEWATER Sub - Type: MAIN REPLACEMENT
Project Code: WW2501 Priority: A
COUNCIL AUTHORIZATION:
February 25, 2025: Conducted a Public Hearing for the proposed 51 st year CDBG project and approved the
recommendation.
RELATIONSHIP TO OTHER PROJECTS AND/ OR MASTER PLAN:
The wastewater mains included in this project are part of the City' s Wastewater System Master Plan.
PROJECT DESCRIPTION:
The project consists of the replacement of the following wastewater mains:
1. 770' from 902 Milam Drive, South along Milam Drive to 750 Milam Drive, and
2. 220' from 804 Milam Drive, West along 805 Milam Drive to the end of 805 Milam Drive.
PROJECT SCHEDULE:
Anticipate Begin Design: October 2025
Anticipate Design Complete: April 2026
Anticipate Begin Construction: July 2026
Anticipate Construction Complete: November 2026
JUSTIFICATION:
Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/ infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst -first approach to reduce maintenance costs and customer
problems.