                                            Capital Project Request


                                                                                                   March  27, 2024
           Department:            PUBLIC  WORKS                                Date  Prepared:
           Submitted By:          MAJOR  JONES                                 Date  Completed:
           Project  Title:        51 ST CDBG LINE REPLACEMENT —  MILAM    DRIVE
           Project  Type:         WASTEWATER                  Sub - Type:   MAIN  REPLACEMENT

           Project Code:          WW2501                      Priority:   A
           COUNCIL  AUTHORIZATION:
            February 25,  2025:  Conducted a Public Hearing for the proposed 51 st year CDBG project and approved the
            recommendation.










           RELATIONSHIP   TO OTHER   PROJECTS   AND/ OR  MASTER   PLAN:
           The wastewater  mains included in this project are part of the City' s Wastewater  System Master Plan.










           PROJECT   DESCRIPTION:
           The project consists of the replacement of the following wastewater mains:

            1.  770'  from 902 Milam Drive,  South along Milam Drive to 750 Milam Drive,  and
            2.  220' from 804 Milam Drive,  West along 805 Milam Drive to the end of 805 Milam Drive.







           PROJECT SCHEDULE:
           Anticipate  Begin  Design:   October  2025
           Anticipate  Design  Complete:   April  2026
           Anticipate Begin Construction:  July 2026
           Anticipate  Construction  Complete:   November  2026





           JUSTIFICATION:
            Many wastewater mains throughout the City are 50+  years old.  Most of these lines are clay tile and are
            susceptible to ground movement,  pulled joints,  root infiltration,  and deterioration from hydrogen sulfide gas.
            Many are substandard in size and have inflow/ infiltration problems.  This project is part of the systematic
            replacement of wastewater mains using a worst -first approach to reduce maintenance costs and customer
            problems.






                Ordinance No.  2432,  Page 214 of 474
                                                             60
   215   216   217   218   219   220   221   222   223   224   225