City of Euless
Capital Project Request
March 27, 2024
Department: PUBLIC WORKS Date Prepared:
Submitted By: MAJOR JONES Date Completed:
Project Title: LR — OAKWOOD TERRACE N PHASES 1, 11, & III ENGINEERING
Project Type: WASTEWATER Sub - Type: MAIN REPLACEMENT
Project Code: WW2502 Priority: A
COUNCIL AUTHORIZATION:
November 12, 2024: Authorized the City Manager to execute an engineering design contract with Wier &
Associates, Inc. The estimated expenditure is $ 98, 850.
RELATIONSHIP TO OTHER PROJECTS AND/ OR MASTER PLAN:
The wastewater mains included in this project are part of the City' s Wastewater System Master Plan.
PROJECT DESCRIPTION:
The project consists of the engineering design for the replacement of wastewater mains in the following areas:
Phase I — Between Mary Drive and Marlene Drive from Eastcliff Drive to Marlene Drive,
Phase II — 1. Along Eastcliff Drive from Mary Drive to Tyler Avenue and
2. 607- 805 Commerce Street, and
Phase III — Between Tyler Avenue and Marlene Drive from Eastcliff Drive to Commerce Street.
PROJECT SCHEDULE:
Began Design: December 2024
Anticipate Design Complete: September 2025
JUSTIFICATION:
Many wastewater mains throughout the City are 50+ years old. Most of these lines are clay tile and are
susceptible to ground movement, pulled joints, root infiltration, and deterioration from hydrogen sulfide gas.
Many are substandard in size and have inflow/ infiltration problems. This project is part of the systematic
replacement of wastewater mains using a worst -first approach to reduce maintenance costs and customer
problems.