City of Euless

                                            Capital Project Request


                                                                                                   March  27, 2024
           Department:            PUBLIC  WORKS                                Date  Prepared:
           Submitted By:          MAJOR  JONES                                 Date  Completed:
           Project  Title:        LR — OAKWOOD TERRACE      N PHASES 1, 11, &   III ENGINEERING
           Project  Type:         WASTEWATER                  Sub - Type:   MAIN  REPLACEMENT

           Project Code:          WW2502                      Priority:   A
           COUNCIL  AUTHORIZATION:
            November  12,  2024:  Authorized  the City Manager to execute an engineering  design contract with Wier &
           Associates,  Inc.  The estimated expenditure is $ 98, 850.










           RELATIONSHIP   TO OTHER   PROJECTS   AND/ OR  MASTER   PLAN:
           The wastewater  mains included in this project are part of the City' s Wastewater  System Master Plan.










           PROJECT   DESCRIPTION:
           The project consists of the engineering design for the replacement of wastewater mains in the following areas:

            Phase  I —   Between Mary Drive and Marlene Drive from Eastcliff Drive to Marlene Drive,

            Phase  II —  1.   Along Eastcliff Drive from Mary Drive to Tyler Avenue and
                     2.  607- 805 Commerce Street,  and

            Phase  III —  Between Tyler Avenue and Marlene Drive from Eastcliff Drive to Commerce Street.

           PROJECT SCHEDULE:
            Began  Design:   December  2024
           Anticipate  Design  Complete:   September  2025








           JUSTIFICATION:
            Many wastewater mains throughout the City are 50+  years old.  Most of these lines are clay tile and are
            susceptible to ground movement,  pulled joints,  root infiltration,  and deterioration from hydrogen sulfide gas.
            Many are substandard in size and have inflow/ infiltration problems.  This project is part of the systematic
            replacement of wastewater mains using a worst -first approach to reduce maintenance costs and customer
            problems.