 DRAINAGE FUND  •  Completed over 110 gallons graffiti cover up.


 The Drainage Fund ‘s purpose is to track revenues and expenses related to watershed and storm   •  Completed spraying over 1,460 gallons of chemicals along creeks and bridges.
 drainage improvements throughout the City. The drainage system includes curb and gutter, storm   •  Removed wing walls and reshaped the creek at Haltom Road by the library.
 drains, and channels.  In November  2004, the City Council  created the fund to address long-
 standing flooding and drainage issues.  The source of funds is a monthly fee charged to customers   •  Repaired 16 flumes at various locations in Haltom City
 based  upon  a  rate  factor  multiplied  by  the  run-off  coefficient  factor  developed  for  each  parcel   •  Installed new handrails at Whitecreek low water crossings.
 of property in the City.  Each residential property is currently charged $6.81 per month.  Each
 commercial property is charged approximately $56.63 per month for each acre, with adjustments   Objectives for FY2024
 made for variances in the run-off coefficient.
               •  Continue to maintain and improve the current drainage system
 As the City adds additional commercial and residential properties because of growth, revenues will
 increase slightly, but it will not be enough to cover all capital projects needed. It is further unlikely   •  Implemented new procedures and programs based on the new State  storm water
 that an adjustment in the rate structure will be sufficient to finance future capital projects.  This   requirements
 represents a challenge to the City because the Drainage Master Plan has identified slightly more   •  Assist in identifying future drainage projects
 than $100 million of projects that need to be addressed.
               •  Reshaping and grading of channels
 The FY2024 ending cash and investment balance at year end is estimated at $584,923 which is
 approximately 24% of operating expenses. This fund balance meet minimum of 20%. Transfers   •  Cleaning debris from road and bridge crossings
 are made to the Drainage Capital Projects fund for capital improvements, but several projects are
 pushed to future years due to lack of funding.  •  Cleaning inlets and catch basins

               •  Weed control through mowing and herbicide applications
 Mission Statement  •  Continue to improve erosion control with various procedures


 To provide service in a professional manner that complies with Federal and State guidelines;   •  Responding to customer requests pertaining to the drainage system
 implement and maintain an effective storm water management program, flood control,   •  Larvicide ditches
 development review, water quality programs; and to be a steward of our natural resources.
               •  Continue making inlet repairs
 Accomplishment of FY2023
               •  Continue mapping the outfall pipes and inlets.


               •  Map and update the drainage system with the GIS mapping consultant.
 •  Completed the “mid-block” drainage project on Georgian Street
 •  Corrected 7 bridge deficiencies noted in the Texas Department of Transportation’s bridge   •  Continue training and education on stormwater management.
 inspection lists.
 •  Completed reshaping Little Fossil Creek section between Eastridge and Fincher Street.  Actual   Actual   Actual   Target
                                    PERFORMANCE MEASURES
 •  Completed reshaping Minnis and Midway Street drainage channel.    FY2021     FY2022     FY2023      FY2024
                              Mowing / Trimming Grass (Acres)              500         500        400         600
 •  Completed reshaping Little Fossil Creek from Thomas Road to Garden Street.  Erosion repairs with rip rap rock (Tons)  400  400  370  500
                              Acres of drainage channels maintained        300         300        300         300
 •  Completed installing 18inch drainage pipe under McCullar street.  Goal 6:  Address Critical   Number of inlets inspected/maintained  900  900  487  1,100

 •  Completed repairing 23 outfall pipes.  Facility & Infrastructure   Number of bridge site visits for maintenance  30  30  30  30
                  Needs        Herbicide spraying (Gallons)               1,200       1,200      1,460       1,500
 •  Cleaned over 487 inlets.   Graffiti cover-up (Gallons)                  80          80        110         150
                               Bridge inspections and debris removal (Each)  40         40         40          40
 •  Completed over 375 tons erosion repairs with rip rap rocks.  Special Projects  10   12          9          14

 •  Completed over 400 acres mowing and trimming of the drainage channels.
 •  Completed 238 inlets stenciled.