Page 161 - CITY OF AZLE, TEXAS
P. 161

DEPARTMENT                                 UTILITY FUND                                   ACCOUNT
            Utility Maintenance                                                                           02-506

            PURPOSE STATEMENT:
            Our mission is to provide a higher quality of life in Azle by the continuous delivery of potable and palatable water at
            adequate pressure and the safe transportation and delivery of the all wastewater from point of use to the
            wastewater treatment plant.





            GOALS AND OBJECTIVES:

            Decrease water quality complaints in the water distribution system by 5%.
            Rehabilitate one-(1) Lift Station. Electrical control panels, guide rail systems, and internal plumbing
            Reduce complaints regarding sewer backups by 5%.
            Reduce manual meter reading mistakes by 5%
            Replace 150' of 2" water mains in the distribution system.
            Replace 1000' of clay tile sewer main by trenchless cured-in-place pipe.






            KEY POINTS OF PROPOSED BUDGET:
            Personnel Services:  Increase due to impact of FY 23 step increases and increased benefits costs.
            Supplies:  Increase for the purchase of tablet computers and cell phones for department staff.
            Maintenance:  Increase for the continued slip-lining of clay tile sewer mains, and various lift station
                improvements.
            Contractual Services:  Increase for additional staff training and telecommunication service for cell phones and
                tablet computers.
            Capital Outlay:  Increase for the purchase of a vacuum/sewer truck, the construction of covers for materials
                storage bins, and a lift station control panel upgrade.




            KEY INDICATORS OF PERFORMANCE:                                         FY 21-22 FY 22-23 FY 23-24
                                                                                     Actual   Estimate  Projection

            Total wastewater calls                                                   139       122        120
            Percent reduction of total wastewater calls                             6.70%     12.20%    1.60%
            Total Water Quality Complaints                                            30        32        30
            Percent reduction of Water Quality Complaints                           23.00%    6.00%     6.00%
            Total Meter reading mistakes (avg. total meters 4,000)                    48        40        40
            Percent reduction of Meter reading mistakes                             33.00%    16.50%    0.00%
            Total footage of wastewater mains replaced.                               0        1,710      750
            Total footage of water lines replaced.                                   110       130        150







           City of Azle FY 2023-2024 Budget                                                                    150
   156   157   158   159   160   161   162   163   164   165   166