Page 347 - Cover 3.psd
P. 347

ADOPTED | BUDGET


                                Drainage Capital Projects


           Project Name                                        Project Description
         Walker Branch Channel   The project consists of engineering and reconstructing approximately 400 feet of gabions along the
         Repair (200ft South of   Walker Branch Channel. The project begins south of Harwood along the west bank and will focus on
         Harwood Road) -        two areas where the gabion baskets have failed.
         Continuing Project
                                Project Status:  On hold until additional construction funding is secured.











































































                                                             343                                     NRH  | TEXAS
   342   343   344   345   346   347   348   349   350   351   352