Page 227 - CityofMansfieldFY23Budget
P. 227

Department Name:
                                                                                      Engineering


           Mission Statement:
            To facilitate the design and construction of the city’s roadway and utility public infrastructure and to manage city right-of-way in
            an efficient and exemplary manner.

           Services Provided:
            1. Direct and manage the design and construction of all water, sanitary sewer, stormwater and roadway improvement projects.
            2. Review and inspect the design and construction of all public improvements associated with all residential and commercial
            3. Establish and update the roadway and utility infrastructure master plans as well as all associated design and construction standards.
            4. Manage city right-of-way by reviewing, approving, and inspecting all construction activity within the right-of-way.
            5. Facilitate permits and applications related to FEMA designated floodplain inside the city limits.

                 CITY COUNCIL’S STRATEGIC PRIORITIES            N         O           R         T          H


                                                             Noteworthy  Organizational   Remarkable   Together       Healthy
                                                              Essentials  Excellence  Experiences  as One  Economy
                                                             Consistently   Strong team  Distinctive  Create   Sustainable assets,
                                                             high-quality   and internal   services and   community   financial strength &
                                                               services  culture   amenities  connections  growth


                                                                 N         O          R          T         H
           Goal #1                                               ●         ●                               ●
            Provide improvements to city streets, drainage and utility infrastructure with the design and construction of public infrastructure
            improvement projects throughout the Roadway Capital Improvement Program and the Utility Capital Improvement Program.

           Objectives
            1. Continue to direct and manage the design and construction of the 2023 Roadway Capital Program projects and Utility Capital Program
            projects.
            2. Target and monitor specific project schedule milestone for critical projects.
            3. Effectively utilize best project management practices based on the Project Management Institute's PMBOK Guide where applicable.



                                                                          Actual    Actual     Budget    Budget
           Performance Measures                                         2019-2020  2020-2021  2021-2022  2022-2023
            Capital Improvement Project budgets monitored                 18.5M     10.2M      29.4M       25M
            Capital Improvement Program infrastructure projects managed    14         14         17        17
            Length of water improvements constructed (Miles)              12.2       14.9        13        13
            Length of sewer improvements constructed (Miles)               8.7       12.7        10        11
            Length of drainage improvements constructed (Miles)            8.8       10.8        10        10
            Length of street improvements constructed (Miles)              3.5        4.1        5          5




                                                                 N         O          R          T         H
           Goal #2                                               ●         ●                               ●
            Facilitate the addition of and improvements to city streets, drainage and utility infrastructure through the management of both
            residential and commercial development projects related to public infrastructure.
           Objectives
            1. Continue to review the design and inspect the construction of all development projects.
            2. Review all project submittals and approve comments or approval within an appropriate timeframe.
            3. Effectively utilize best project management practices based on the Project Management Institute's PMBOK Guide where applicable.

                                                                                                         223
   222   223   224   225   226   227   228   229   230   231   232