Page 180 - FortWorthFY23AdoptedBudget
P. 180

General Fund





            Summary of Services and Performance Measures


                                                          FY21           FY22            FY23
            Key Measures                                 Actual          Actual         Target      Desired Level


            Street Maintenance
               Manage and maintain street infrastructure. Develop and direct street maintenance programs consisting of rehabilitation and pavement
               preservation applications while also providing efficient customer service to internal and external customers.

            Apply 18 lane miles of asphalt overlay on an annual   20.28  15.99            18             18
            basis (new measure for FY 22)
            Repair potholes within 48 hours 95% of the time  100%        100%            95%             95%


            Stormwater Operations
               To manage and maintain stormwater infrastructure. Stormwater services encompass channel restoration, drainage inlet cleaning and
               inspection, vegetation management and mowing.

            Maintain or restore 7 miles of the open channel   7.48        8.12            7               7
            drainage system on an annual basis
            Clean and inspect 6,350 drainage inlets on an annual   6,638  6,507          6,350          6,350
            basis
            Mow 1,480 acres of vegetation in drainage easements   1,456  1,342           1,480          >1480
            on an annual basis


            Transportation Engineering

               To plan, program and coordinate multimodal transportation system development by providing professional engineering services and
               safety program management.

            Retime 1/3 of the City's Signal Intersections annually to
            optimize traffic flow with changing in traffic patterns and   192  301       300             300
            volumes.
            Conversion of residential street lights to LEDs within the   867  443        275             275
            75% MMA.
            Installation of 1,000,000 linear foot of additional
            pavement markings and improvement of aging     N/A          1,924,901         1M             >1M
            markings.


            Transportation Operations
               To actively operate, plan, and maintain the system of streetlights, signs and traffic signals in a manner that provides safety and achieves
               mobility across all modes of travel.

            Number of instances signals go on flash due to   437          354            300             300
            equipment failure.
            Traffic regulatory sign replacement within 4 hours of
            damage notification 95% of the time            97%            98%            95%             95%





                                                                                              Page 180 of 623
   175   176   177   178   179   180   181   182   183   184   185