Page 161 - CITY OF AZLE, TEXAS
P. 161

DEPARTMENT                                 UTILITY FUND                                   ACCOUNT
            Utility Maintenance                                                                           02-506

            PURPOSE STATEMENT:
            Our mission is to provide a higher quality of life in Azle by the continuous delivery of potable and palatable water at
            adequate pressure and the safe transportation and delivery of the all wastewater from point of use to the
            wastewater treatment plant.





            GOALS AND OBJECTIVES:

            Decrease water quality complaints in the water distribution system by 5%.
            Rehabilitate one-(1) Lift Station. Electrical control panels, guide rail systems, and internal plumbing
            Reduce complaints regarding sewer backups by 5%.
            Reduce manual meter reading mistakes by 5%
            Replace 250' of 2" water mains in the distribution system.
            Replace 1000' of clay tile sewer main by trenchless cured in place pipe.






            KEY POINTS OF PROPOSED BUDGET:
            Personnel Services:  Increase due to impact of FY 22 step increases, increased benefits costs, and increase
                 related to salary plan market adjustment.
            Maintenance:  Continuation of sewer line slip-lining project in the Shoreline Dr. area and continuation of
                 adding lift stations to the City's SCADA system.
            Capital Outlay:  Increase for the purchase of a new pickup, lift station control panel upgrade, and water meter
                 purchases for installation at newly constructed homes.








            KEY INDICATORS OF PERFORMANCE:                                         FY 20-21 FY 21-22 FY 22-23
                                                                                     Actual   Estimate  Projection

            Total wastewater calls                                                   156       153        150
            Percent reduction of total wastewater calls                             25.00%    -1.90%    -1.80%
            Total Water Quality Complaints                                            26        26        25
            Percent reduction of Water Quality Complaints                           -3.50%    0.00%     -3.50%
            Total Meter reading mistakes (avg. total meters 3,000)                    34        45        40
            Percent reduction of Meter reading mistakes                             5.80%     24.40%    -11.00%
            Total footage of wastewater mains replaced.                              1,214     1,270     1,572
            Total footage of water lines replaced.                                  348.5'     625'      300'







           City of Azle FY 2022-2023 Budget                                                                    150
   156   157   158   159   160   161   162   163   164   165   166