CAPITAL IMPROVEMENTS  PROGRAM (CIP)

                                                                             MOBILITY



                           Funding   Total Prior
             Project number                      FY 2022   FY 2023  FY 2024   FY 2025   FY 2026   Beyond     Total
                           Source     Funding

            Mustang Court
            Industrial    Funding is requested for study and design related to access improvements for the Mustang Court Industrial Area.
            Area Access
            Improvements


                          General
            2022-15                          $0    $50,000       $0       $0        $0        $0        $0     $50,000
                          Fund


            Shady Oaks
            Drive and     Funding is planned for the engineering design and construction of the intersection improvements at Shady Oaks Drive and
            West Highland   West Highland intersection. The intersection is currently experiencing a “D” Level of service during morning peak times. This
            Intersection   intersection was identified as needing improvement in the Citywide Intersection Analysis conducted in 2017.
            Improvements
                          General
            2022-16c                         $0        $0   $160,000  $350,000  $600,000      $0        $0   $1,110,000
                          Fund
                          Roadway
            2022-16c      Impact Fee         $0   $140,000       $0       $0        $0        $0        $0    $140,000
                          Fund
                          Total              $0   $140,000  $160,000  $350,000  $600,000      $0        $0   $1,250,000


            Continental
            Boulevard and
            South Peytonville  Funding is planned for right of way, engineering design, construction, art and landscaping of a planned roundabout at the
                          Continental Boulevard and South Peytonville Avenue intersection. Drainage improvements will also be included with this project,
            Avenue
            Intersection   specifically the improvement of Critical Drainage Structure #19.
            Improvements
                          General
            2022-17c                         $0        $0   $250,000 $1,040,000     $0        $0        $0   $1,290,000
                          Fund
            2022-17c      Utility Fund       $0        $0        $0  $200,000       $0        $0        $0    $200,000
                          Roadway
            2022-17c      Impact Fee    $200,000  $500,000  $200,000  $760,000      $0        $0        $0   $1,660,000
                          Fund

                          Storm
            2022-17c      Water Utility      $0        $0   $150,000  $250,000      $0        $0        $0    $400,000
                          System

                          Total         $200,000  $500,000  $600,000 $2,250,000     $0        $0        $0   $3,550,000


            Brumlow Avenue
            Widening and
            Bike Lane     Funding is planned for the future widening of Brumlow Avenue from Continental Boulevard to State Highway 26 to its ultimate
            construction   pavement section (four lanes divided). Bike lanes will also be constructed to facilitate connectivity to the Cotton Belt Trail.
            from Continental
            Boulevard to
            State Highway 26
                          General
            2022-18                          $0        $0   $750,000 $2,250,000  $5,000,000   $0        $0   $8,000,000
                          Fund