Page 301 - Project Detail Sheet_AdoptedBook
P. 301
ADOPTED | BUDGET
Utility Capital Projects
Assess and Repair 16-inch Water Transmission Main
UT1801
352-(&7 '(6&5,37,21 -867,),&$7,21
This project will consist of assessing the 16-inch concrete bar-wrap pipe (BWP) water transmission main that begins at the
Airport Freeway entry point and extends to the Conn Ground Storage Tank. This transmission main transports water from the
City of Fort Worth to the City of North Richland Hills. The total length of pipe to be inspected is approximately 8,300 linear feet.
There are 7 different phases to the assessment: site reconnaissance and project planning, transient pressure monitoring, leak
and air pocket detection, electromagnetic (EM) inspection, pipe performance curve, final report, and field verification/validation.
These seven phases will identify the pipes that need to be reconstructed or rehabilitated. Once the assessment has been
completed, staff will begin planning the identified necessary repairs and or section replacements. Staff has already identified a
section of pipe, roughly 300 feet, along Airport Frwy that will be repaired as part of this project. An entry point and exit point will
be constructed to gain access for the assessment.
352-(&7 67$786 25,*,1$/ 25,*,1$/
67$57 '$7( 5(9,6,21 (1' '$7( 5(9,6,21
Professional Services 10/2017 09/2018
Engineering
Land/ROW Acquisition
Construction 07/2018 05/2020
Other
5(9,6,21 (;3/$1$7,21
Project completed.
),1$1&,$/ '$7$
$'237(' 5(9,6(' 727$/
%8'*(7 7+58 352-(&7 %8'*(7 7+58 5(0$,1,1* 352-(&7
5(9,6,21 %$/$1&( &267
)81',1* 6285&(6
Certificates of Obligation $500,000 ($97,097) $402,903 $402,903
0 $0
0 $0
0 $0
0 $0
7RWDO $500,000 ($97,097) $402,903 $0 $402,903
352-(&7 (;3(1',785(6
$225,000 $225,000 $225,000
Professional Services
Engineering/Design 0 $0
Land/ROW Acquistion 0 $0
Construction 275,000 (97,097) 177,903 $177,903
Other 0 $0
7RWDO $500,000 ($97,097) $402,903 $0 $402,903
,03$&7 21 23(5$7,1* %8'*(7
$118$/ 23(5$7,1* ,03$&7 727$/
Projected $0
288
NRH | TEXAS