Page 176 - Project Detail Sheet_AdoptedBook
P. 176

ADOPTED | BUDGET

                                                   Utility Capital Projects
                Department                                     Project Title                         Project Number
        Public Works                         Sewer Manhole Replacement and Rehabilation Project           UT1904
                                                      Project Description
        This project will replace or rehabilitate roughly 150 sewer manholes identified as needing replacement.










                                                      Project Justification
        Staff has inspected roughly 75% of the entire inventory of sewer manholes in the collection system.  Through this process, manholes
        were evaluated on structual condition. The inspector could give five different ratings: excellent, good, fair, poor, or very poor.  This
        project will focus on the manholes that were identified in the poor and very poor range.  The number of manholes currently classified
        as poor and very poor is 523.  The overall number of manholes in the collection system is 5,497, of which staff have roughly 1,375
        remaining manholes to inspect.  Based on the data staff predict roughly another 130 more manholes to rate as poor and very poor
        once inspections are completed.  This would result in a total of 653 manholes falling into these two classifications.  This shows that
        roughly 10% of the inventory of manholes in the system are in need of attention.  Staff will plan work for the manholes in the greatest
        need of replacement or rehabiliation.  Staff will use different forms of rehabilitation technology to try and control cost and extend the
        life of manholes.
        Project Status Update: Project is currently underway.






        Project Schedule            Beginning Date   Ending Date        History          Fiscal Year   Amount
        Professional Services                                        Adopted Budget        2018-19       $150,000
        Engineering/Design               10/2018         04/2019         Total                           $150,000
        Land/ROW Acquisition
        Construction                     04/2019         01/2021
        Other
        Total Schedule                   10/2018         01/2021
        Sources of Funds             Appr. To Date  2021‐22 Budget  2022‐23 Estimate  2023‐Completion  Total Funding
        General Obligation Bonds
        Certificates of Obligation       150,000              0                0               0         $150,000
        Federal/State Grants
        Reserves
        Sales Tax
        Other
        Total Funding                   $150,000             $0               $0              $0          $150,000

        Project Costs                  To Date    2021‐22 Budget  2022‐23 Estimate   2023‐Completion    Total Cost
        Professional Services
        Engineering/Design                25,000               0               0               0           $25,000
        Land/ROW Acquisition
        Construction                     125,000               0               0               0          $125,000
        Other
        Total Costs                      $150,000             $0              $0              $0          $150,000
        Operating Impact
        No operating impact is anticipated.


        Fiscal Year                2020‐21       2021‐22      2022‐23       2023‐24       2024‐25     Total Impact
        Amount                           $0            $0            $0            $0            $0           $0