Page 254 - City of Mansfield FY22 Operarting Budget
P. 254
UTILITIES OPERATIONS
MISSION STATEMENT:
To provide a reliable system for delivering high-quality drinking water and the conveyance of
wastewater, all while maintaining a professional level of customer service.
Services Provided
• Maintain and repair all infrastructure associated with the water distribution system.
• Maintain and repair all infrastructure associated with the sanitary sewer system.
• Inspect new and existing backflow devices, irrigation systems, grease traps, and private plumbing
to ensure our water and sanitary sewer systems' integrity.
Accomplishments in FY 2020-2021
• Exercised and inspected 1,200 valves and all public fire hydrants in the distribution system.
• Preventatively cleaned 500,000 linear feet of sanitary sewer lines.
• Corrected potential hazards by conducting 120 customer service inspections.
FY 2021-2022 Goals & Objectives
1. Develop and maintain a proactive maintenance program for the sanitary sewer system.
• Reduce inflow and infiltration
• Perform proactive repairs to the sanitary sewer system to prevent future overflows.
• Develop a thorough and accurate list of lines that need repeat cleaning.
2. Develop and maintain a proactive maintenance program for the water distribution system.
• Reduce customer outages by locating and exercising valves.
• Incorporate a flow testing program into our daily functions.
• Repair leaks in a timely manner to minimize water loss.
3. Maintain 100% compliance with state and local regulations in the inspections group.
• Inspect all new irrigation systems.
• Perform a customer service inspection on new and existing properties as required.
• Inspect all grease traps and ensure they are maintained as required.
253