Page 257 - Hurst Adopted FY22 Budget
P. 257

APPROVED FISCAL YEAR 2022 BUDGET

            CITY COUNCIL STRATEGIC PRIORITIES











          Redevelopment       Public Safety      Leadership       Innovate    Economic Vitality Infrastructure



                                    Goals and Objectives




         Goals

               Continue to review traffic survey data to address its impact on traffic flows, quality of streets, capacity of streets,
               adequate and proper signalization and air quality.

               Recommend streets for Community Development Block Grant (CDBG) reconstruction.

               Utilize Street Inventory pavement condition index (PCI) rating in deciding on what street sections to mill and overlay, seal
               coat, or totally reconstruct.
               Perform the correct maintenance at the proper time in the streets life cycle.

               Expand the practice of utilizing County employees to assist with the asphalt overlay of arterial and collector streets in Hurst.

               Conduct traffic studies to maintain an accurate record of traffic volumes (on major roadways).
               Consider major arterial improvements as traffic volumes approach their capacity.
               Identify drainage issues for Engineering Division.

               Maintain the drainage systems in a condition for efficient and safe passage of storm water.

               Control vegetation in channels by mowing or through chemical application.

               Maintain Surface Drainage Program which includes curb and gutter, driveways, sidewalks and valley gutters.


         objectives


               Manage all traffic control devices in a serviceable condition by replacing within 4 days faded and/or vandalized devices.
               Respond to emergency complaints within thirty minutes and resolve within twenty-four hours.

               Manage all signalized intersections to minimize traffic delay.
               Provide assistance to other departments to help provide the “Hurst Way” level of customer service.

               Respond to citizen complaints in a timely and efficient manner.

               Select specific sections of curb & gutters, and street pavement to replace.

               Control vegetation in channels by mowing and chemical application.

               Inspections and repairs of channels and bridges and inlet inspections.

               Maintain the drainage system and clear obstructions before and after rain events.
                                                                                                          257
   252   253   254   255   256   257   258   259   260   261   262