Mission Statement
o provide for effective administration of Public Works activities that ensures safe
T and efficient roadway systems, water and sewer systems, and storm drainage sys-
tems. The Engineering Division also seeks to ensure that all City public paving improve-
ments, water and sewer improvements, and public drainage improvements are designed
and constructed in accordance with City regulations and accepted engineering and con-
struction principles and practices.
Prior Year Results Prior Year Results Cont.
h Completed design and began construction h Advance Funding Agreement with TXDOT
of the 46th Year CDBG Grant Project / Living- approved for Bedford Euless Road Bridge
ston Drive from West Pipeline Road to 665 Replacement over Lorean Branch
feet south. h Completed design and began construction
h Completed 2021 Annual Street Rehabilitation of the 46th Year CDBG Grant Project on
Program with Tarrant County and contractors Livingston Drive (sewer portion).
h Completed franchised utility adjustments for h Coordinated with Trinity River Authority on
Pipeline Road Phase 3. finalizing design of Walker-Calloway Waste-
h Completed design for West Pipeline Road water Outfall System Rehabilitation Project,
Phase 3 and advertised for bids. Phases 2 and 3.
h Began construction of 2020 Miscellaneous h Completed design and construction of 2020
Street Reconstruction Program Miscellaneous Water Main Replacements
h Applied for six street reconstruction projects, h Completed design and began construction
one Safe Routes to School for sidewalk con- of 2020 Miscellaneous Sanitary Sewer Re-
struction near three elementary schools, and placements
one Chisholm Park Trail project with Tarrant h Completed design and began construction
County as part of their 2021 Transportation of the North Precinct Line Road Elevated
Bond Program. Storage Tank Rehab and Repaint project
h Review of numerous private development h Completed Update to the Water and Waste-
projects. water Impact Fee Study.
h Began construction of Hurstview Drive Bridge h Completed the federal unfunded mandate
Repairs over Lorean Branch of a Risk and Resilience Assessment and
h Completed construction of Valley View certified it with EPA in May 2021, Emergen-
Branch Channel Repairs cy Response Plan for our water system.
h Completed Preliminary Engineering Study h Review of numerous private developments
on Norwood North Storm Drain Arch Pipe with public water mains and sanitary sewer.
Rehabilitation