             Mission Statement




                  o provide for effective administration of Public Works activities that ensures safe

             T and efficient roadway systems, water and sewer systems, and storm drainage sys-
             tems. The Engineering Division also seeks to ensure that all City public paving improve-

             ments, water and sewer improvements, and public drainage improvements are designed
             and constructed in accordance with City regulations and accepted engineering and con-

             struction principles and practices.





              Prior Year Results                                      Prior Year Results Cont.

          h   Completed design and began construction              h   Advance Funding Agreement with TXDOT
              of the 46th Year CDBG Grant Project / Living-           approved for Bedford Euless Road Bridge
              ston Drive from West Pipeline Road to 665               Replacement over Lorean Branch
              feet south.                                          h   Completed design and began construction
          h   Completed 2021 Annual Street Rehabilitation             of the 46th Year CDBG Grant Project on
              Program with Tarrant County and contractors             Livingston Drive (sewer portion).
          h   Completed franchised utility adjustments for         h   Coordinated with Trinity River Authority on
              Pipeline Road Phase 3.                                  finalizing design of Walker-Calloway Waste-
          h   Completed design for West Pipeline Road                 water Outfall System Rehabilitation Project,
              Phase 3 and advertised for bids.                        Phases 2 and 3.
          h   Began construction of 2020 Miscellaneous             h   Completed design and construction of 2020
              Street Reconstruction Program                           Miscellaneous Water Main Replacements
          h   Applied for six street reconstruction projects,      h   Completed design and began construction
              one Safe Routes to School for sidewalk con-             of 2020 Miscellaneous Sanitary Sewer Re-
              struction near three elementary schools, and            placements
              one Chisholm Park Trail project with Tarrant         h   Completed design and began construction
              County as part of their 2021 Transportation             of the North Precinct Line Road Elevated
              Bond Program.                                           Storage Tank Rehab and Repaint project
          h   Review of numerous private development               h   Completed Update to the Water and Waste-
              projects.                                               water Impact Fee Study.
          h   Began construction of Hurstview Drive Bridge         h   Completed the federal unfunded mandate
              Repairs over Lorean Branch                              of a Risk and Resilience Assessment and
          h   Completed construction of Valley View                   certified it with EPA in May 2021, Emergen-
              Branch Channel Repairs                                  cy Response Plan for our water system.
          h   Completed Preliminary Engineering Study              h   Review of numerous private developments
              on Norwood North Storm Drain Arch Pipe                  with public water mains and sanitary sewer.
              Rehabilitation