CIP AND CAPITAL PROJECTS FUNDS



                   which is approximately 12,500 linear feet.  Whitley Road is a thoroughfare listed on the
                   Watauga Master Thoroughfare Plan.   Whitley Road Phase I is now complete.  Whitley
                   Road Phase II started construction on August 12, 2019, and is scheduled to be
                   completed in December 2020.  The improvement will also include underground storm
                   drains and the rehabilitation or replacement of any water lines and sanitary sewer lines
                   under Whitley Road as needed.

                   Justification: Whitley Road is a major thoroughfare of the City. The existing asphalt
                   pavement is deteriorating.  The traffic flow on Whitley Road will improve considerably
                   with the improvements to this road.

                   Operating Impact:  This project began in FY2016/2017 and will carry over into FY2020-
                   2021. This street improvement will have little or no impact on operations.  These
                   projects are funded through multiple Certificates of Obligation proceeds and Storm
                   Drain fees.


               ™ Description:  Bowie Street – The Bowie
                   Street project limits are from Highway 377 to
                   Plum Street, a length of approximately 415
                   linear feet.  Bowie Street is an asphalt street
                   that has severely deteriorated.  The project
                   will repave the asphalt, add sidewalks,
                   replace underground storm drains and
                   rehabilitate or replace any water lines and
                   sanitary sewer lines under Bowie Street as
                   needed.


                   Justification:  The existing asphalt
                   pavement in Bowie Street is deteriorating.
                   We anticipate this will rejuvenate the area for commercial development.

                   Operating Impact:  This street improvement will have little or no impact on operations.
                   It will be funded through the 2018 Certificate of Obligation proceeds and Storm Drain
                   fees.

               ™ Description:  Meadowlark Lane East -
                   Meadowlark Lane East will run from Heather
                   Drive to west of Pebblebrook Drive.  The
                   project includes a complete reconstruction of
                   the street, water main improvements and
                   sanitary sewer improvements. The new street
                   section shall be concrete paving with 4’ wide
                   sidewalks running along both sides of the
                   roadway.