Page 151 - Watauga FY21 Budget
P. 151

GENERAL FUND



        DEPARTMENT: PUBLIC WORKS
        DIVISION / ACTIVITY:       STREETS DIVISION – FUND 01-090
        LOCATION:                                           HOURS OF OPERATION:
        7800 Virgil Anthony Sr. Blvd.                       Monday – Friday            8:00 A.M. – 5:00 P.M.
        Watauga, Texas 76148
        Phone Number: 817-514-5806
        MISSION / PROGRAMS / SERVICES:

        Public Works strives to:
            x  Provide excellent quality service and maintenance for Watauga streets, signs, and traffic signals
            x  Promote ease of mobility throughout the City by maintaining our streets in a timely, efficient, and
               cost effective manner
            x  Provide a high degree of customer service and satisfaction
            x  Maintain the traffic signals and signs to assist in the flow of the City


        FY2019-2020 HIGHLIGHTS / ACHIEVEMENTS:

            x  Resurface North Park from Whitley to Indian Springs. A total of 1,040 linear feet of curb and
               gutter was replaced. Along with 450 square feet of driveway approach, 2,460 square feet of
               valley gutter and 10 linear feet of storm drain inlet apron
            x  Maintained 88 miles of roads, signs, traffic signals and road markings to an acceptable manner
            x  Storm drainage safety-install fence protection at approximately three locations
                        rd
            x  Install 3 light on the back of the school zone flashers
        FY2020-2021 GOALS/ OBJECTIVES:


            x  Maintain a high level of service to all of our citizens and continue to maintain the 88 miles of
               roads and signage to a cost effective manner
            x  Continue storm drainage safety program
            x  Continue overlay program
            x  Rehabilitate Dunson Ct., Dunson Drive, Whitley Rd. between Bursey and North Tarrant.


        MAJOR BUDGETARY ISSUES AND OPERATIONAL TRENDS:

            x  Rising cost of asphalt and concrete
            x  Unstable cost of fuel and lubrication
            x  Rising cost of dumping debris from repair projects
            x  Rising costs of contractor fees


















                                                                                                          143