Drainage Capital Projects
Snow Heights Drainage Improvements Project
DR1801
352-(&7 '(6&5,37,21 -867,),&$7,21
The area along the eastbound Loop 820 frontage road, east of Rufe Snow Drive was developed decades ago with no
underground drainage improvements. As a result the area becomes inundated during moderate rainfall events. The proposed
underground storm drain system will provide capacity for almost 11 acres of commercially zoned property and ties into the
storm drain improvements installed by TxDOT during the North Tarrant Express highway project several years ago. The scope
of the project includes the installation of aproximately 1,200 linear feet of concrete drainage pipe with intake structures. Phase I
of the project installed the upstream portion of the drainage system and created a temporary overland path. Phase II of this
project will continue the drainage from the previous project (DR1801) and connect via approximately 450 LF of concrete pipe to
the existing drainage system in the eastbound Loop 820 frontage road.
352-(&7 67$786 25,*,1$/ 25,*,1$/
67$57 '$7( 5(9,6,21 (1' '$7( 5(9,6,21
Professional Services
Engineering 10/2017 09/2020
Land/ROW Acquisition
Construction 12/2017 03/2020
Other
5(9,6,21 (;3/$1$7,21
Project close out.
),1$1&,$/ '$7$
$'237(' 5(9,6(' 727$/
%8'*(7 7+58 352-(&7 %8'*(7 7+58 5(0$,1,1* 352-(&7
5(9,6,21 %$/$1&( &267
)81',1* 6285&(6
Reserves $170,000 ($4,567) $165,433 $165,433
Other 150,000 0 150,000 $150,000
0 $0
0 $0
0 $0
7RWDO $320,000 ($4,567) $315,433 $0 $315,433
352-(&7 (;3(1',785(6
$0 $0
Professional Services
Engineering/Design 25,000 25,000 $25,000
Land/ROW Acquistion 0 $0
Construction 295,000 (4,567) 290,433 $290,433
Other 0 $0
7RWDO $320,000 ($4,567) $315,433 $0 $315,433
,03$&7 21 23(5$7,1* %8'*(7
$118$/ 23(5$7,1* ,03$&7 727$/
Projected $0
283