Page 299 - N. Richland Hills Capital Budget
P. 299

Drainage Capital Projects
                                       Snow Heights Drainage Improvements Project
                                                           DR1801


           352-(&7 '(6&5,37,21   -867,),&$7,21
            The area along the eastbound Loop 820 frontage road, east of Rufe Snow Drive was developed decades ago with no
            underground drainage improvements. As a result the area becomes inundated during moderate rainfall events. The proposed
            underground storm drain system will provide capacity for almost 11 acres of commercially zoned property and ties into the
            storm drain improvements installed by TxDOT during the North Tarrant Express highway project several years ago. The scope
            of the project includes the installation of aproximately 1,200 linear feet of concrete drainage pipe with intake structures. Phase I
            of the project installed the upstream portion of the drainage system and created a temporary overland path. Phase II of this
            project will continue the drainage from the previous project (DR1801) and connect via approximately 450 LF of concrete pipe to
            the existing drainage system in the eastbound Loop 820 frontage road.





           352-(&7 67$786                         25,*,1$/                                25,*,1$/
                                                 67$57 '$7(    5(9,6,21                   (1' '$7(     5(9,6,21
           Professional Services
           Engineering                            10/2017                                 09/2020
           Land/ROW Acquisition
           Construction                           12/2017                                 03/2020
           Other

           5(9,6,21 (;3/$1$7,21
            Project close out.




           ),1$1&,$/ '$7$
                                                  $'237('                    5(9,6('                    727$/
                                                %8'*(7 7+58    352-(&7     %8'*(7 7+58   5(0$,1,1*     352-(&7
                                                               5(9,6,21                   %$/$1&(        &267
           )81',1* 6285&(6
            Reserves                                $170,000      ($4,567)     $165,433                  $165,433
            Other                                    150,000            0       150,000                  $150,000
                                                                                     0                         $0
                                                                                     0                         $0
                                                                                     0                         $0
           7RWDO                                    $320,000      ($4,567)     $315,433          $0      $315,433
           352-(&7 (;3(1',785(6
                                                                                    $0                         $0
             Professional Services
             Engineering/Design                       25,000                     25,000                   $25,000
             Land/ROW Acquistion                                                     0                         $0
             Construction                            295,000       (4,567)      290,433                  $290,433
             Other                                                                   0                         $0
           7RWDO                                    $320,000      ($4,567)     $315,433          $0      $315,433

           ,03$&7 21 23(5$7,1* %8'*(7




           $118$/ 23(5$7,1* ,03$&7                                                                      727$/
           Projected                                                                                           $0



                                                             283