Major Capital Equipment Capital Projects
Northeast Parkway Extension
ST2005
352-(&7 '(6&5,37,21 -867,),&$7,21
This project consists of constructing an extension of Northeast Parkway west of Davis Boulevard towards Smithfield Road. The
new pavement will intersect with Davis at a proposed traffic signal, and will include a roundabout midway between Davis and
Smithfield to accomodate a future Snider Street connection and provide traffic calming. The project will be constructed in two
phases, with the Davis connection through the roundabout included in Phase I, and the connection to Smithfield in Phase II
after the exisitng elementary school is demolished in 2021.
352-(&7 67$786 25,*,1$/ 25,*,1$/
67$57 '$7( 5(9,6,21 (1' '$7( 5(9,6,21
Professional Services
Engineering 09/2019 03/2020
Land/ROW Acquisition
Construction 04/2020 12/2020
Other
5(9,6,21 (;3/$1$7,21
),1$1&,$/ '$7$
$'237(' 5(9,6(' 727$/
%8'*(7 7+58 352-(&7 %8'*(7 7+58 5(0$,1,1* 352-(&7
5(9,6,21 %$/$1&( &267
)81',1* 6285&(6
Reserves $790,000 $25,000 $815,000 $815,000
0 $0
0 $0
0 $0
0 $0
7RWDO $790,000 $25,000 $815,000 $0 $815,000
352-(&7 (;3(1',785(6
$0 $0
Professional Services
Engineering/Design 50,000 0 50,000 $50,000
Land/ROW Acquistion 0 $0
Construction 740,000 25,000 765,000 $765,000
Other 0 $0
7RWDO $790,000 $25,000 $815,000 $0 $815,000