Utility Capital Projects



           Project Name                                      Project Description
         SCADA Communication     The Utility Division uses a Supervisory Control and Data Acquisition (SCADA) system to remotely monitor, make
         Replacement - New Project  adjustments, and track trends within the water and wastewater system.








         Sewer Impact Fee Project -   The Sewer Impact Fee Project consists of the professional services needed to support the data collection, tracking, and
         Continuing Project      analysis of the City's impact fee program.









         Sewer Manhole Replacement   This project will replace or rehabilitate roughly 150 sewer manholes identified as needing replacement.
         and Rehabilation Project -
         Continuing Project








         Sewer Manhole Replacement   This project will replace or rehabilitate roughly 150 wastewater manholes throughout the City. Staff has completed an
         and Rehabilitation Project   inspection of approximately 5,500 manholes. Through this inspection process, it has been identified that 12% of the
         (2021) - New Project    manholes (approximately 660) need some form of replacement or rehabilitation. This project will be spread out over a 5
                                 year period to complete all 660 manholes.






         Small Water Main Replacements   This is an annual program that is completed by the Public Works Construction Division.  The project replaces old 2" and
         (2017) - Continuing Project  4" water mains with 6" or larger water pipes and provides adequate fire hydrant coverage to areas currently without
                                 proper coverage.  This project will provide for small water main replacement on the following streets:  Circleview Dr.
                                 (Lariat to Shady Lake), Meadow Ct. (Lola to cul-e-sac), Meadowbrook Dr. (Royal Ridge to Brookridge), Woodcreek Ln.
                                 (Lariat to Riviera), and Spring Lea Way (Starnes to Lincoln).






         Small Water Main Replacements   This is an annual program that is completed by the Public Works Construction Division (407-6007).  The project
         (2019) - Continuing Project  replaces old 2" and 4" water mains with 6" or larger diameter water pipes. This project provides adequate fire hydrant
                                 coverage to areas currently without proper coverage.  This project will provide for small water main replacement on the
                                 following streets:  Freda Lane (Pearl to Newman), Davis Boulevard (Woods to Bursey), Circleview Drive (Lariat to Shady
                                 Lake), Meadowbrook Drive (Royal Ridge to Brookridge) and Woodcreek Lane (Lariat to Riviera).