Parks & Recreation Capital Projects



           Project Name                                      Project Description
         NRH Centre Grand Hall AV   This project provides replacement of two AV projectors, one in Ballroom B and one in Ballroom C of the Grand Hall at
         Projectors Replacement - New   the NRH Centre.  The project includes replacing the eight year old originally installed AV projectors with new  8k lumen
         Project                 laser projectors designed to work better with existing artificial and natural room lighting while also providing much clearer
                                 images than current projectors that were installed when the NRH Centre opened in April 2012.






         NRH Centre Indoor Aquatic Pool   This project is to re-plaster the Aquatics Facility at the NRH Centre.  The pool plaster serves as a waterproof layer
         Re-Plaster - Continuing Project  between the pool water and the shell of the pool, protecting it's structural integrity.  The project will include removal and
                                 replacement of all the pool plaster down to the substrate/gunite surface. Specifications of the project will include needed
                                 substrate repairs, tile repair and replacement of grates as needed.  In order to provide the most minimal impact to the
                                 NRH Centre public operations this project is expected to be completed within the month of December 2018 so that the
                                 facility can re-open to the public on January 1, 2019.  This project was initially budgeted in the FY 2017-18 NRH Centre
                                 Operating Budget. Staff obtained estimates from local pool vendors, however the formal bids significantly exceeded the
                                 available budget.  All bids were rejected and only patch repairs have been completed to date.


         Park Infrastructure Maintenance   This project provides for maintenance of park infrastructure in response to use and age. The FY2020 priorities include
         (2020) - Continuing Project  Fall Zone Material, Concrete Trail Panel Replacement, Playground Equipment Replacement, Sport Field Bulb
                                 Replacement, Sports Field Infield Refurbishment, Drinking Fountain Replacement, Green Valley Arch and Soffit Repair
                                 and Replacement, Liberty Park Granite Plaque, Norich Park Drainage, Ace Park Fence Replacement, Norich Park
                                 Fence Repair, Green Valley Drainage Infrastructure Study, Walkers Creek Park Dumpster and Northfield Park
                                 Bleachers.





         Park Infrastructure Maintenance   This project provides for maintenance of park infrastructure in response to use and age. The FY2021 priorities include
         (2021) - New Project    playground fall safe material, playground equipment replacement, sports field restoration, concrete panel replacement,
                                 drinking fountain replacement, and North Electric Trail bridge deck repairs.







         Park Infrastructure Maintenance   This Project provides for maintenance of park infrastructure in response to use and age. The Parks and Recreation
         2015 - Continuing Project  Department developed an Infrastructure Management Plan for park amenities. The plan addresses the long term
                                 funding needs for replacement and renovation of park sites and their amenities, demonstrating responsible stewardship
                                 of property assets by the City. Funding is included to address sports field renovation, sidewalk and trail repair, bridge
                                 deck replacement, replacement of park furniture and drinking fountains, park rules and regulation sign replacement and
                                 irrigation renovation.





         Park Infrastructure Maintenance   This project provides for maintenance of park infrastructure in response to use and age. The FY 2017-2018 priorities
         2018 - Continuing Project  include concrete trail repair, retaining wall repairs, park restroom partitions and fixtures, athletic field fencing, erosion
                                 control, playground fall zone material, security lighting maintenance, restroom/concession building repairs and drinking
                                 fountain repairs and replacement.