Utility Capital Projects



           Project Name                                      Project Description
         Conn Pump Station Pump and   This project is to reconfigure existing suction header piping and pumps to meet the Hydraulic Institute standard for pipe
         Electrical Rehabilitation -   pumping and to upgrade and reconfigure electrical components to meet the National Electric Code.
         Continuing Project







         Franklin Court Sewer Addition   This project consists of design and construction of a new 6” sanitary sewer along Franklin Court with a partial
         and Gifford Connection -   connection to Gifford for future development.  The project will consist of approximately 1,000 linear feet of 6” sanitary
         Continuing Project      sewer.








         Garwood Drive Sanitary Sewer   This is the 45th Year Community Development Block Grant (CDBG) Project.  The project will consist of reconstructing
         (CDBG) - Continuing Project  approximately 1,400 linear feet of sanitary sewer main.









         Johnson Pump Station    This project will consist of the replacement of (2) two pumps and motors inside the Johnson Pump Station facility
         Component and Infrastructure   located at 8501 Harwood Road.  Included will be replacement of a short section of discharge header pipe outside the
         Replacements - Continuing   pump station, replacement of the entry pipe from the road side to the storage tank, and replacement of the manually
         Project                 operated water valve with a motorized valve on the entry pipe.






         Large Valve Replacement   The Large Water Valve Replacement Project encompassed the replacement of two, 24 inch valves, a 12 inch valve, and
         Project - Continuing Project  the installation of a 16 inch valve.  The 24 inch valve replacements are located at the intersections of Hightower and
                                 Smithfield Road and Hightower and Davis Boulevard.  The 12 inch valve replacement is located at Davis Boulevard and
                                 Odell Street.  The installation of the 16 inch valve will be near the intersection of Glenview Drive and Dawn Drive.







         Main / Snider / Center Utility   The project consists of engineering and construction of water and sanitary sewer main extensions to provide service to
         Project - Continuing Project  properties north and south of Main Street off of Snider Street and Center Street in the TOD.