Page 386 - Keller Budget FY21
P. 386

FY 2020- 21 KELLER FEE SCHEDULE


              Sewer  Service Tap                         350— 4- inch tap within the City( if contractor  required  due to extenuating
               Corporate City Limits)                   circumstances,  contractor  costs are to be borne  by the applicant)


                                                        Actual cost— larger than 4- inch tap within the City

                                                        Outside City— Cost as determined on a case by case basis by Director of
                                                        Public Works based on actual costs and impact to the system


              Water/ Sewer Connection  Bore  Costs      Bore fee to apply as needed based on actual linear foot cost

              Street Lights                              10. 50 per month  per pole(  maximum  of 24 months)

              Sanitary  Sewer Camera Fee                 225 each— per residential building permit

              Old Town  Keller Asphalt  Parking           Existing buildings/ facilities— actual cost of materials

                                                          New buildings/ facilities and existing buildings/ facilities with privately
                                                        funded  improvements  exceeding$  50, 000— no cost
                                                        Public parking space construction scope and schedule to be at the discretion
                                                        of the Department of Public Works and dependent upon the availability of
                                                        funding as determined by the City

              Miscellaneous  right- of- way  encroachment,      100 each
              dedication  or abandonment

              Miscellaneous easement dedication  or      100 each
              abandonment

              Preliminary  Plat                         N/ A( see' Plat' info below)

              Final Plat                                N/ A( see'  Plat'  info below)


              Replat                                     400  per application  plus$ 20 per lot  residential( exceeding  one  lot);$ 350
                                                        per application for single family lot


              Plat( Preliminary,  Final,  and Amended)   300  per  application  plus$ 20 per lot  residential( exceeding  one lot);$ 250
                                                        per application  for single residential  lot
                                                         300 per application  plus$  20 per acre for non- residential

              Planned Development                        400, plus$ 10 per acre for planned development, planned development
                                                        amendment and future land use plan amendment
                                                         250 thoroughfare  plan amendment

              Specific Use Permit                        350, plus$  10 per acre

              Rezoning Application                       350,  plus$ 10 per  acre









                                                             384
   381   382   383   384   385   386   387   388   389   390   391