Page 384 - Keller Budget FY21
P. 384
FY 2020- 21 KELLER FEE SCHEDULE
Misc. Plumbing Permit 50/ Permit— misc. plumbing( water heater/ gas line to pool/ spa)
Only charged when no building permit is issued for construction
Re- Inspection Fee 50/ for each additional re- inspection
Only assessed after an inspection fails more than once for the same
violation
Sign Permit 50 per sign permit
Mural Permit 350 application
Temporary Sign Permit 25 per sign
Pool Permit 500/ in- ground pools
50/ above ground pools and spas/ hot tubs
Temporary Building Permit 50. 00
Demolition Permit 50
Network Node( Small Cell) Permit Application Fee $ 320 per application
Network Node( Small Cell) Right of Way Use Fee $ 28 per node, per month
Sidewalks/ Curb Cut Fees Fees based on actual costs as derived from City' s current miscellaneous
concrete contract, maximum of$ 1, 500
Supplemental Plan Review Fee 50 per hour( minimum 2 hours residential and 3 hours commercial). Only
assessed after original set of plans has been reviewed and approved for
construction and changes are made to the plans by the developer/ owner/
builder/ representative
Irrigation Permit 50 each— residential
100 each— commercial
Miscellaneous Inspections 50 each
Lost Packet Fee 50 each
Map Printing Fees( new) 11" x 17" = None
22" x 34" _ $ 15
24" x 36" _ $ 15
36" x 48" and larger=$ 25
Special Event Permit Fee 25
No permit costs for non- profits
250- Security deposit
25 per hour/ 2 hour min.— Maintenance Staff
Supplies at cost plus 10%
382