Page 385 - Keller Budget FY21
P. 385
FY 2020- 21 KELLER FEE SCHEDULE
Sec. 2- Planning and Engineering
Supplemental Plan Review Fee 50 per hour( minimum 2 hours residential and 3 hours commercial). Only
assessed after original set of plans has been reviewed and approved for
construction and changes are made to the plans by the developer/ owner/
builder/ representative
Resubmittal Fee 500 per resubmittal when plans are resubmitted and 30% or more previous
comments have not been addressed.
Inspection Fee— Streets and Drainage Four percent( 4%) of construction value, plus$ 60/ hour overtime( as
necessary)
Water and Sewer Inspection Four percent( 4%) of construction value, plus$ 60/ hour overtime( as
necessary)
Water Service Tap/ Meter Short Tap and Meter Installation
Corporate City Limits) 450
Y4--$ 475
1--$ 500
1%-$ 900
2""***-$ 1, 025
2" Compound Meter-$ 2, 325
Water Service Tap/ Meter Long Tap and Meter Installation
Corporate City Limits) 800
cont.) 825
1"-$ 850
1%"-$ 1, 275
2"***-$ 1, 425
2" Compound Meter-$ 2, 725
Install meter only
275
V-$300
1--$ 325
1%"-$ 725
2"***-$ 775
2" Compound Meter-$ 2, 075
Water main and service on same side of street
Water service( meter installation) on opposite side of street from water
main may include bore fees
Cost includes a 2" turbine or disc- type meter
Outside City— Cost as determined on a case by case basis by Director of
Public Works based on actual costs and impact to the system
3" or more— Actual meter cost plus service charge fees.
383