FY 2020- 21 KELLER FEE SCHEDULE
Fire Construction Permit Fees 23. 50$ 1-$ 500 cv
23. 50$ 501-$ 2, 000 cv- First$ 500, plus$ 3. 05 for each additional$ 100 or
fraction thereof to and including$ 2, 000; plus plan review fee equal to 65%
of construction permit fee
69. 25$ 2, 001-$ 25, 000 cv- First$ 2, 000+$ 14 for each additional$ 1, 000 or
fraction thereof to and including$ 25, 000; plus plan review fee equal to 65%
of construction permit fee
391. 25$ 25, 001-$ 50, 000- First$ 25, 000, plus$ 10. 10 for each additional
1, 000 or fraction thereof to and including$ 50, 000; plus plan review fee
equal to 65% of construction permit fee
643. 75$ 50, 001-$ 100,000- First$ 50, 000, plus$ 7 for each additional
1, 000 or fraction thereof to and including$ 100, 000; plus plan review fee
equal to 65% of construction permit fee
Fire Construction Permit Fees 993. 75$ 100, 001-$ 500,000- First$ 100, 000, plus$ 5. 60 for each additional
1, 000 or fraction thereof to and including$ 500, 000; plus plan review fee
equal to 65% of construction permit fee
3, 233. 75$ 500,001-$ 1, 000,000- First$ 500,000, plus$ 4. 75 for each
additional$ 1, 000 or fraction thereof to and including$ 1, 000, 000; plus plan
review fee equal to 65% of construction permit fee
5, 608.75 over$ 1 million- First$ 1 million, plus$ 3. 65 for each additional
1, 000 or fraction thereof; plus plan review fee equal to 65% of
construction permit fee
Contractor Documentation Fee 50 annually, due January 1st of each year
Fire Operational Permit Fees See Fire Construction Permit Fees
Fire Apparatus Fees 400 hour- Fire apparatus w/ crew- 2 hour minimum
200 hour- Brush truck w/ crew- 2 hour minimum
250 hour- Ambulance w/ crew- 2 hour minimum
150 hour- ATV ambulance w/ crew- 2 hour minimum
280 hour- K. I. S. D. football game, EMS- per game
75 hour- Inspector- 2 hour minimum
60 hour- Standby firefighter- 2 hour minimum