DRAINAGE BOND FUND
FUNDED PROJECTS
Project Description Project Justification Status 09/30/20 Operating Impact 9/30/20
This project consists of repairs to joints, This project is currently in TBD
substructure point repairs, spalled This project is necessary to improve traffic flow along the planning phase.
surface concrete, and the concrete Pipeline Road. This project will include the results of the
railings. redevelopment efforts and zoning overlay for the area
east of Precinct Line Road. Tarrant County has pledged
to participate in 50% of the construction cost.
The plans are to remove and replace Recent heavy rains have contributed to the Valley View This project is currently in TBD
what channel liner is damaged as well as Branch concrete channel liner slopes cracking and the planning phase.
fortify the toe of slope on a portion of the heaving upstream of East Pipeline Road to Plaza
channel. A portion of the flume which Boulevard. This stretch of concrete channel is over 40
comes in from the east will be widen and years old. The failures are severe enough to warrant
reconnected. quick evaluation of the failures and design of repairs.
The longer the failures are left without repair there is a
possibility for future damage to the adjacent channel
liner. Staff has taken action to temporarily mitigate the
situation while waiting for the repairs to be bid and
awarded.