Page 161 - Grapevine Budget FY21
P. 161

FY 2020-21 APPROVED OPERATING BUDGET
                STORMWATER DRAINAGE UTILITY FUND
                SDUS - OPERATIONS DIVISION SUMMARY
                116-535-001




                                                             2017-18   2018-19    2019-20   2019-20    2020-21
                EXPENDITURES BY OBJECT                        Actual     Actual   Budget    Estimate  Approved

                Personnel                                          533,062           509,937           559,846           517,037           544,184
                Supplies                                             19,676             21,894             29,700             23,974             29,700
                Maintenance                                        115,988           138,868           125,000           171,076           125,000
                Services                                           313,125           198,377           204,525             26,291           206,792
                Insurance                                                 -            159,824           162,060           187,718           120,166
                Capital Outlay                                       62,911           342,343           210,000           562,365           210,000
                Transfers                                          109,407           112,059           112,000             99,012           108,750

                Total                                           1,154,169         1,483,302       1,403,131       1,587,473       1,344,592



                OBJECTIVES

                - Excavate, re-grade and re-sod 12,000 linear feet of roadside ditches and outfalls.
                - Clean, reset and replace 800 linear feet of reinforced concrete pipe.
                - Inspect and clean 950 restricted underground storm sewer structures.
                - Respond to citizen concerns in a timely manner, reducing the possibility of recurring flood situations.
                - Repair damaged gutter lines reducing the amount of ponding water on curb and gutter streets.
                - Perform required erosion control on above-ground drainage facilities.
                - Clean and remove brush and debris along bridge embankments at road crossings, reducing the possibility of damage to bridge structures.



                                                             2017-18   2018-19    2019-20   2019-20    2020-21
                PERFORMANCE INDICATORS                        Actual     Actual   Budget    Estimate  Approved

                Ditch excavation (linear feet)                 11,047    11,490    12,000     12,000    13,000
                Reset reinforced concrete pipe (linear feet)    1305       510       800        800       700
                Clean storm sewer structures (ea.)              953        787       950        950       900
                Clean debris adjacent to bridges (times / year)   4         4          4         4          4
                Sweeping miles                                 21,524    25,056    17,000     17,000    18,000

















                                                             153
   156   157   158   159   160   161   162   163   164   165   166