DIVISIONAL SUMMARY                                                                                    FY 2020-21 BUDGET


                   Function                                                    Department   Division                                         Account
                   PUBLIC SERVICES                           PUBLIC WORKS                   STREET MAINTENANCE                            01-42-01


                   ACTIVITY DESCRIPTION:
                   The Public Works Division of the Public Works Department is responsible for: maintaining streets, curbs/gutters, sidewalks, and stormwater
                   systems; installing and maintaining traffic signs; maintaining traffic signals; assisting with the annual overlay program; street sweeping; and
                   mowing rights-of-way. The Public Works Department also provides support to other departments requiring manpower and equipment.
                   The Public Works Department is administered by the Street Superintendent, under the direction of the Public Services Director.



                   ACTIVITY GOALS:
                   • To ensure municipal infrastructure is maintained at a high level to maximize resident satisfaction & minimize repair or replacement costs.
                   • To maintain all traffic signals and signs in accordance with the Texas Manual on Uniform Traffic Control Devices.
                   • To reduce construction runoff and street debris from entering the city's stormwater system.
                   • To promptly respond to citizen concerns.
                   • To assist other departments with equipment and manpower as needed.

                   ACTIVITY OBJECTIVES:
                   • To monitor expenditures to remain at or under budget.
                   • To efficiently maintain all street and stormwater infrastructure within the city.
                   • To work with closely with Benbrook Water Authority to coordinate infrastructure repair and replacement projects.
                   • To adhere to the street sweeping schedule.
                   • To adhere to the street maintenance and replacement plan.

                   ACTIVITY MEASUREMENTS:                                                      ACTUAL       ACTUAL       ESTIMATED      PROJECTED
                                                                                               2017-18      2018-19       2019-20        2020-21
                   Percent of Budget Expended                                                      97.5%        95.6%           95.2%        100.0%
                   Number of Street Repairs Made                                                               120                    180                         190                      200
                   Average Hours of Curb Swept Monthly                                                           72                      72                           72                        72
                   Sign Projects Completed                                                                     190                    320                         350                      200
                   Number of BWA Repairs Made                                                                    35                      40                           50                        50
                   Linear Ft of Overlay/Reclaim Streets                                                    8,606              18,461                   18,414                 18,500
                   Dry Stream Testing Performed                                                                  79                      80                           85                        85