Page 421 - NRH FY20 Approved Budget
P. 421

Facilities Capital Projects



           Project Name                                      Project Description
         Replacement of HVAC Systems   This project is for the replacement of roof top HVAC units at Fire Stations #1 ($29,000) and #4 ($30,000).
         at Fire Stations #1 and #4 -
         Continuing Project








         Upgrade / Remodel of Public   This project consists of the addition of two (2) commodes and urinals, an additional hand wash station, addition of
         Works' Restrooms - Continuing   industrial style vent fan system, removal of double shower area and replacing the commodes and urinal partitions and
         Project                lockers. The project will entail significant concrete slab removal and plumbing. Floor ceramic tile will be replaced and the
                                walls and the ceiling will be repaired and painted. MEP professional services will be required to ensure existing plumbing
                                will handle additions and that proper standards are used.



































































                                                             417
   416   417   418   419   420   421   422   423   424   425   426