Page 280 - NRH FY20 Approved Budget
P. 280
DEPARTMENT / DIVISION FUND
PUBLIC WORKS – SEWER UTILITY
PROGRAM NAME
WASTEWATER OPERATIONS
DESCRIPTION / MISSION
Public Works Wastewater Operations Division is responsible for providing the city’s 18.2 square mile service area with a safe,
reliable system for the collection and disposal of wastewater. The wastewater collection system is comprised of approximately 292
miles of various size lines. The collection system also has approximately 5,188 manholes and 2 mechanical lift stations. Our
mission involves a commitment to maintaining a superior wastewater service that focuses on the interest of the city, the citizens it
serves, and the protection of the environment. Comprehensive training, constant monitoring and assessment of the collection
system provide for an efficient and accountable operation. In addition, newly developed standards and technologies are routinely
explored for cost effectiveness and improved service.
GOALS
• To maintain a safe and reliable wastewater collection system that meets or exceeds all federal, state and local regulations with
safe methods. (Safety and Security)
• To decrease infiltration and inflow (I & I) to the collection system. (Financial Stability)
• To prepare and implement emergency operations for catastrophic conditions. (Safety and Security)
• To maintain public confidence in wastewater maintenance and reliability. (Positive City Image)
• To continue to be in compliance with the city’s Sanitary Sewer Overflow (SSO) Initiative Program with the Texas Commission on
Environmental Quality (TCEQ). (Safety and Security)
OBJECTIVES
• Maintain standard number of 30 minutes to respond to complaints and wastewater backups during normal business hours.
• Continue the identification process and repairs to known or suspected points in the collection system, which have been
compromised.
• To decrease Inflow and Infiltration (I&I) to the collection system by performing manhole and cleanout repairs and replacements
identified in the sanitary sewer assessment study performed in the southern portion of the city.
• Maintain program system to ensure routine cleaning of at least 40% of the wastewater collection system lines annually, and
cleaning all noticed trouble spots on a monthly basis.
• Utilize flow meter devices to monitor inflow/infiltration in the wastewater collection system to make necessary repairs to points of
entry.
• Maintain preparedness for electrical configuration at sewer lift stations to allow for the use of auxiliary power in the event of loss
of primary power supply.
• Maintain positive attitude when dealing with citizens and encourage feedback for improving operations.
• Meet annual reporting requirements for the SSO Initiative Program.
2017-18 2018-19 2019-20
PERFORMANCE MEASURES ACTUAL REVISED ESTIMATED
Goal: Safety and Security
# Of safety meetings (monthly meetings) 12 12 12
# Of test and maintenance checks on auxiliary power generators
(monthly checks) 12 12 12
# Of manholes inspected 323 500 500
Goal: Financial Stability
# Of manhole and clean out repairs and replacements at
identified sources of Inflow & Infiltration 32 80 80
# Of employee time off due to on-the-job injury (in hours) 80 hours 322 hours 40 hours
% Of SSO agreement plan with TCEQ reporting parameters met 100.00% 100.00% 100.00%
Amount of budget (excludes FTW/TRA cost for sewer) $2,642,574.00 $2,756,814.00 $2,397,100.00
Amount of sewer treated (in gallons) 2,210,933,000 2,101,635,684 2,183,119,800
Total cost of sewer treatment (FTW/TRA) $6,029,726.00 $6,139,582.00 $6,583,926.00
Amount of overtime $27,590.00 $20,000.00 $20,000.00
Estimated replacement value of sewer system (In Millions) $121.30 $126.00 $132.00
Goal: Positive City Image
Average response time to calls concerning wastewater problems
in homes or businesses (in minutes):
Normal business hours 30 mins 30 mins 30 mins
After hours (nights/weekends) 60 mins 60 mins 60 mins
276