Page 326 - NRH FY20 Approved Capital Budget
P. 326

Municipal Facility Capital Projects
                                                  Fire Maintenance Awning
                                                           FC1803


           352-(&7 '(6&5,37,21   -867,),&$7,21
            This project includes constructing a metal awning along the west shop bay doors at Fire Maintenance. The structure would be
            30' length x 30' width x 20' height with brick columns. Also included is the relocation of the dumpster enclosure.

            Fire mechanic technicians frequently have to perform repairs or replacements on fire apparatus equipment outside the shop.
            Providing this addition would cover the technicians during inclement weather or severe heat days and reduce the building heat
            load effects in the afternoon operating hours during summer months. In addition, it would provide cover for the equipment,
            while systems are open for repairs.






           352-(&7 67$786                         25,*,1$/                                25,*,1$/
                                                 67$57 '$7(    5(9,6,21                   (1' '$7(     5(9,6,21
           Professional Services
           Engineering
           Land/ROW Acquisition
           Construction                           10/2017                                 09/2018
           Other

           5(9,6,21 (;3/$1$7,21
            Project is completed and ready to close.




           ),1$1&,$/ '$7$
                                                  $'237('                    5(9,6('                    727$/
                                                %8'*(7 7+58    352-(&7     %8'*(7 7+58   5(0$,1,1*     352-(&7
                                                               5(9,6,21                   %$/$1&(        &267
           )81',1* 6285&(6
            Reserves                                 $60,000        ($250)      $59,750                   $59,750
                                                                                     0                         $0
                                                                                     0                         $0
                                                                                     0                         $0
                                                                                     0                         $0
           7RWDO                                     $60,000        ($250)      $59,750          $0       $59,750
           352-(&7 (;3(1',785(6
                                                                                    $0                         $0
             Professional Services
             Engineering/Design                                                      0                         $0
             Land/ROW Acquistion                                                     0                         $0
             Construction                             60,000         (250)       59,750                   $59,750
             Other                                                                   0                         $0
           7RWDO                                     $60,000        ($250)      $59,750          $0       $59,750

           ,03$&7 21 23(5$7,1* %8'*(7
            No operating impact is anticipated.


           $118$/ 23(5$7,1* ,03$&7                                                                      727$/
           Projected                                                                                           $0



                                                             306