Page 285 - NRH FY20 Approved Capital Budget
P. 285
Street & Sidewalk Capital Projects
Rufe Snow Dr. Street & Utility Imp. (Karen Drive to I.H. 820)
ST0102
352-(&7 '(6&5,37,21 -867,),&$7,21
This project begins at Karen Drive and ends on the north side of Corona Drive (approximate ending of the TxDOT Bridge
project). The intersection at Meadowlakes Drive will be improved as part of this project. Rufe Snow Drive will be widened with
right turn lanes and improved signalization. This section will transition from the wider section at the bridge to the 4 lane section
at Karen Drive. The project will be constructed as a concrete street with sidewalks and all necessary water and sewer main
adjustments. Street lights and signalization at Meadow Lakes will be constructed to the City's standards.
This section of Rufe Snow Drive was originally constructed in the 1960's as an asphalt street. The average life of an asphalt
street is 20 years. This street is over 40 years old and has never been overlaid. The current street condition rating is 45. This
rating is considered to be Poor, consisting of significant potholes, complete surface deterioration, and misaligned curb and
pavement surface. The additional lanes added to this section of Rufe Snow will reduce traffic congestion at the freeway
frontage roads.
352-(&7 67$786 25,*,1$/ 25,*,1$/
67$57 '$7( 5(9,6,21 (1' '$7( 5(9,6,21
Professional Services
Engineering 02/2006 04/2015
Land/ROW Acquisition 08/2008 01/2015
Construction 05/2015 03/2017
Other
5(9,6,21 (;3/$1$7,21
Project is completed and ready to close.
),1$1&,$/ '$7$
$'237(' 5(9,6(' 727$/
%8'*(7 7+58 352-(&7 %8'*(7 7+58 5(0$,1,1* 352-(&7
5(9,6,21 %$/$1&( &267
)81',1* 6285&(6
General Obligation Bonds $1,425,950 $1,425,950 $1,425,950
Reserves 50,000 (7,303) 42,697 $42,697
0 $0
0 $0
0 $0
7RWDO $1,475,950 ($7,303) $1,468,647 $0 $1,468,647
352-(&7 (;3(1',785(6
$0 $0
Professional Services
Engineering/Design 170,000 170,000 $170,000
Land/ROW Acquistion 198,331 198,331 $198,331
Construction 1,107,619 (7,303) 1,100,316 $1,100,316
Other 0 $0
7RWDO $1,475,950 ($7,303) $1,468,647 $0 $1,468,647
,03$&7 21 23(5$7,1* %8'*(7
$118$/ 23(5$7,1* ,03$&7 727$/
Projected $0
265