Page 287 - Hurst FY20 Approved Budget
P. 287
CITY OF HURST
ENTERPRISE FUND PUBLIC WORKS 0668 WATER
Objectives:
• Evaluate the city infrastructure annually and determine projects that need rehabilitation
or new construction.
0-3 Short Term
• Assist the Engineering Division by prioritizing projects in the capital improvement
program manual into short, mid-range and long-term projects.
0-3 Short Term
• Monitor water quality to ensure compliance with Safe Drinking Water Act rules and
regulations.
0-3 Short Term
• Operate and maintain all water system equipment and facilities to ensure the safety of
the potable water delivered to the customers.
0-3 Short Term
• Maintain or reduce surcharge costs paid to the Fort Worth Water Department annually
by maintaining or lowering the Max-Day and Max-Hour three-year averages for each.
0-3 Short Term
• Improve water accountability and reduction of lost revenues through commercial meter
testing, repair and replacement and prompt main leak repairs.
0-3 Short Term
Choose a Timeline
Performance Measures: PY Actual CY Estimate Projected
Input:
Total operating budget ($) 10,338,355 10,444,867 10,391,686
Water treatment cost ($) 4,789,275 4,959,501 4,693,052
City of Hurst Annual Water Well
Production (MG) 32.7 25 25
Workload/Output:
Water Quality Samples Taken 3250 3,500 3,500
271
198