Page 287 - Hurst FY20 Approved Budget
P. 287

CITY OF HURST


           ENTERPRISE FUND                          PUBLIC WORKS                          0668 WATER




                Objectives:

                    •  Evaluate the city infrastructure annually and determine projects that need rehabilitation
                       or new construction.
                         0-3 Short Term

                    •  Assist the Engineering Division by prioritizing projects in the capital improvement
                       program manual into short, mid-range and long-term projects.
                         0-3 Short Term

                    •  Monitor water quality to ensure compliance with Safe Drinking Water Act rules and
                       regulations.
                         0-3 Short Term

                    •  Operate and maintain all water system equipment and facilities to ensure the safety of
                       the potable water delivered to the customers.
                         0-3 Short Term

                    •  Maintain or reduce surcharge costs paid to the Fort Worth Water Department annually
                       by maintaining or lowering the Max-Day and Max-Hour three-year averages for each.
                         0-3 Short Term

                    •  Improve water accountability and reduction of lost revenues through commercial meter
                       testing, repair and replacement and prompt main leak repairs.
                         0-3 Short Term
                         Choose a Timeline


                 Performance Measures:                    PY Actual         CY Estimate          Projected


                 Input:

                 Total operating budget ($)              10,338,355          10,444,867         10,391,686


                 Water treatment cost ($)                 4,789,275           4,959,501          4,693,052
                 City of Hurst Annual Water Well
                 Production (MG)                             32.7                25                  25


                 Workload/Output:


                 Water Quality Samples Taken                3250                3,500              3,500







                                                             271





                                                             198
   282   283   284   285   286   287   288   289   290   291   292