Page 286 - Hurst FY20 Approved Budget
P. 286

CITY OF HURST


           ENTERPRISE FUND                          PUBLIC WORKS                          0668 WATER










                FUTURE INITIATIVES

                     Continue to monitor water quality through sampling for Nitrification Triggers as required in
                       the Hurst Nitrification Action Plan (NAP).
                     Continue collect and submit monthly Revised Total Coliform Rule Samples (RTCR) to the
                       TCEQ.
                     Clean and inspect the North Precinct Line Elevated Storage Tank (EST), Valentine EST,
                       and TCC EST.
                     Assist Engineering with the design and replacement deteriorated cast iron water mains.
                     Submit the 2019 Texas Water Development Board (TWDB) Water Loss Audit.
                     Submit the 2019 TWDB Water Use Survey, Conservation Report, and Utility Profile.
                     Submit the 2019 TCEQ Utility Profile.
                     Submit the 2019 TCEQ Water Quality Report.
                     Schedule the 2019 Water Quality Report Public Meeting for July 2020.
                     Submit Lead & Copper samples to the TCEQ (once every three years).
                     Test a minimum of 115 Commercial Meters throughout the distribution system.
                     Continue to manage water conservation efforts through the mandatory 2 day per week
                       watering and no watering between 10am – 6 pm that began June 24, 2014.
                     Assist in the replacement and installation of any proposed Water Replacement Project.
                                       rd
                     Complete  the  3   year  of  the  Unregulated  Contaminates  Monitoring  Rule  Sampling  4
                       (UCMR4) as required by the Environmental Protection Agency.
                     Complete a system wide replacement of obsolete Radio Telephone Units (RTU) control
                       boards  for  accurate  communications  between  SCADA  and  all  of  our  pump  stations,
                       elevated storage facilities and Fort Worth Supply Vaults.





                GOALS, OBJECTIVES & PERFORMANCE MEASURES

                Council Priorities:  Infrastructure

                Goals:


                    •  Ensure adequate quality and quantity of water supplied to each customer by monitoring
                       and maintaining the system while continuing to provide our best customer service.
                    •  Minimize cost and increase water revenues with proper management of the water
                       system.
                Enter goal here






                                                             270





                                                             197
   281   282   283   284   285   286   287   288   289   290   291