Page 286 - Hurst FY20 Approved Budget
P. 286
CITY OF HURST
ENTERPRISE FUND PUBLIC WORKS 0668 WATER
FUTURE INITIATIVES
Continue to monitor water quality through sampling for Nitrification Triggers as required in
the Hurst Nitrification Action Plan (NAP).
Continue collect and submit monthly Revised Total Coliform Rule Samples (RTCR) to the
TCEQ.
Clean and inspect the North Precinct Line Elevated Storage Tank (EST), Valentine EST,
and TCC EST.
Assist Engineering with the design and replacement deteriorated cast iron water mains.
Submit the 2019 Texas Water Development Board (TWDB) Water Loss Audit.
Submit the 2019 TWDB Water Use Survey, Conservation Report, and Utility Profile.
Submit the 2019 TCEQ Utility Profile.
Submit the 2019 TCEQ Water Quality Report.
Schedule the 2019 Water Quality Report Public Meeting for July 2020.
Submit Lead & Copper samples to the TCEQ (once every three years).
Test a minimum of 115 Commercial Meters throughout the distribution system.
Continue to manage water conservation efforts through the mandatory 2 day per week
watering and no watering between 10am – 6 pm that began June 24, 2014.
Assist in the replacement and installation of any proposed Water Replacement Project.
rd
Complete the 3 year of the Unregulated Contaminates Monitoring Rule Sampling 4
(UCMR4) as required by the Environmental Protection Agency.
Complete a system wide replacement of obsolete Radio Telephone Units (RTU) control
boards for accurate communications between SCADA and all of our pump stations,
elevated storage facilities and Fort Worth Supply Vaults.
GOALS, OBJECTIVES & PERFORMANCE MEASURES
Council Priorities: Infrastructure
Goals:
• Ensure adequate quality and quantity of water supplied to each customer by monitoring
and maintaining the system while continuing to provide our best customer service.
• Minimize cost and increase water revenues with proper management of the water
system.
Enter goal here
270
197