                To  provide  safe  drinking  water  in  sufficient  volumes  with  adequate  pressure  to  the  water
                customers of Hurst and maintain the integrity of the water distribution system.


                DIVISION DESCRIPTION

                The Water Division is responsible for the maintenance and operation of water production and
                distribution.  These include approximately 205 miles of water lines, 1,236 fire hydrants, 4,413
                water system valves, 12,393 active connections, ten ground storage tanks with a capacity of 9.3
                million gallons, three elevated storage tanks with a capacity of 2.75 million gallons, two water
                supply connections with the City of Fort Worth, six City owned water wells and three emergency
                water supply connections.


                PRIOR YEAR RESULTS & ACCOMPLISHMENTS

                      Completed the rebuild of Pump# 54 at Station No. 5 and Pump#42 at Station No. 4
                      Cleaning and inspection of two (2) elevated storage tanks.
                      Completed the Update to the Drought/Emergency Water Management Plan.
                      Completed the Update to the Water Conservation Plan.
                      Submitted the 2018 Texas Water Development Board Water (TWDB) Loss Audit.
                      Submitted the 2018 TWDB Water Use Survey.
                      Submitted the 2018 TWDB Conservation Report.
                      Submitted the 2018 TWDB Utility Profile
                      Submitted the 2018 Texas Commission of Environmental Quality (TCEQ) Utility Profile.
                      Submitted the 2018 Water Quality Report to the TCEQ.
                      Held the 2018 Water Quality Report Public Meeting for July 17, 2018.
                      Continued the Unregulated Contaminant Monitoring Rule Stage 4 Sampling (UCMR4) as
                       required by the EPA and TCEQ. Projected completion is late 2019.
                      Continued development and use of the City Works Asset Management System.
                      Completed installation of the North Precinct Line Elevated Storage Tank (EST) Water
                       Quality Control System
                      Completed the North Precinct Line EST Emergency Riser Repair
                      Submitted over 600 required water quality samples representing the City of Hurst Water
                       System as a whole to TCEQ.
                                       rd
                      Completed the 3  Year Water System Investigation through the TCEQ without deficiency.
                      Submitted  required  Nitrification  Samples  for  the  Hurst  water  system  as  per  the  2017
                       Nitrification Action Plan (NAP).
                      Completed 95 Commercial Meter Tests with repairs and replacements as needed.