Page 65 - Haltom City FY20 Approved Budget
P. 65

City of Haltom City Annual Budget, FY 2020
                                                                                        General Fund

           BUILDING MAINTENANCE





             Mission Statement                  Building  Maintenance  Division  ensures  a  safe  and
                                                comfortable  working  environment  for  all  employees  in  City
           facilities as well as to provide prompt response, quality service and the efficient resolution of
           maintenance problems.



             Accomplishments of FY2019
                 Put  in  French  Drain  under  the  Veterans  Memorial  to  remove  any  water  that  could  be
                  causing the fountain to move.
                 Assisted in remodel of Animal Shelter. Removed and replaced all the kennels. Installed
                  new Stainless sinks and cabinets. Installed new sewer and water service to new bathroom
                  and shower in garage. Painted the foyer, hall, kitten room and employee lounge. Built new
                  walls around the shower. Installed new lighting and fixtures.
                 Replaced majority of fence around Placid house. Cleaned and installed new cedar around
                  upstairs. Called a list of contractors to finish punch list before it sold.
                 Ran electrical for Midway EST lighting for Water department. Installed new poles and lights
                  for this project also.
                 Installed new utilities for prefab bathroom at North Park. Ran Sewer, Electricity and Water
                  for the building and installed subgrade for the building
                 Installed new utilities for prefab bathroom at Pecan Park. Ran Sewer, Electricity and Water
                  for the building and installed subgrade for the building.
                 Installed new utilities for prefab bathroom at Buffalo Ridge Park. Ran Sewer, Electricity and
                  Water for the building and installed subgrade for the building.
                 Installed new wall for Fire Department upstairs for Admin for their remodel.
                 Installed new wall for Fire Department downstairs for their remodel.
                 Installed new water fountain at city hall
                 Demoed the concrete at Rec Center with the assistance of St. Dept
                 Brian has run this department without a full time assistant.
                 Repaired multiple sheetrock issues at fleet and repainted the offices.



             Objectives of FY2020

                 Provide  a  better  and  more  efficient  building  maintenance  program  through  prompt
                  response in performing and supervising repair activities.
                 Provide a comprehensive preventative maintenance program to ensure the efficiency and
                  availability of building systems.
                 Ensure a suitable working environment for City employees through proper maintenance,
                  thereby providing better service to citizens.
                 Create a list of potential AC replacement for 2021.
                 Install LED lighting in PreCouncil.
                 Install new door and security access at Public Works.






                                                           Page 61
   60   61   62   63   64   65   66   67   68   69   70