Page 189 - Saginaw FY19 Annual Budget
P. 189
£ ¤
287
17 Ú Ú Bailey Boswell Road Ú Ú
Ú
12 156 14
Ú 16 15 Completed FM
1 Ú
Completed
Ú Ú Ú
Ú Ú 13
Completed Ú
Road Saginaw
Blvd
Decatur 6
Old
1 1 Ú
Ú Ú
E McLeroy Blvd
Ú
10 Ú 7
Ú W McLeroy Blvd Ú
Ú
Ú
9 3
Ú Completed
Ú 156
FM
Ú Ú
4
Completed 5
Ú Ú
18 Ú Ú
Ú Ú
Longhorn Road E Industrial Ave
8 2
287
Completed £ ¤
Matchline 1) Park Center Elevated Storage Tank Rehabilitation
2016-2021 Water CIP
Matchline
2) S. Hampshire 16" Water Line Matchline
3) CDBG Bluebonnet Street 6" Water Line
4) Saginaw Blvd. 12" Water Line Ph. 2
5) Saginaw Blvd. 16" Water Line Ph. 2
6) FM 156 Utility Relocations
7) W. McLeroy 12" Water Line Ph. 2
8) Fort Worth Meter Station Upgrade
9) Old Decatur 8" Water Line
10) Old Decatur 12" Water Line Ph. 1
11) East McLeroy Blvd. 12" Water Line
12) Basswood Blvd. 12" Water Line
13) Heather Ridge Pkwy. 12" Water Line
14) FM 156 12" Water Line Ph. 2
15) Condor Trail 12" Water Line
16) Defiel Rd. 8" Water Line
17) Bailey Boswell Rd. 12" Water Line Loop
18) Longhorn Rd. & Old Decatur 8" Water Line Connection
Map Disclaimer
This map product is for informational
City of Saginaw, Texas purposes and may not have been
2018 Annual Budget Retreat prepared for or be suitable for legal,
engineering, or surveying purposes.
WATER CIP It does not represent an on-the-ground
W
survey
only
the
and
represents
approximate relative location of property
August 2018
185 boundaries.