DRAINAGE BOND FUND
                                                      FUNDED PROJECTS


                     Project Description            Project Justification       Status 09/30/18  Operating Impact  9/30/18

              This project will widen Pipeline Road from   This project is necessary to improve traffic flow along Pipeline  Construction began during the  O&M impact due to reduced
              Precinct Line Road to Hurstview Drive. Many  Road. This project will include the results of the redevelopment 2016-2017 budget year and is   maintenance costs with
              of the intersections have been widened in   efforts and zoning overlay for the area east of Precinct Line   estimated to be complete   construction of new street.
              preparation for this project.  Road.  Tarrant County has pledged to participate in 50% of the somtime during fiscal year 2018-
                                        construction cost.                 2019.
              This project consists of lining an existing                  This project is currently in the   TBD
              corrugated metal storm drain pipe with a cast-  This project will repair some corroded spots in the flow line of   planning phase.
              in-place pipe material.  Some access to the   the arch pipe and extend the life for another 50 years plus.
              pipe will be required to install the lining.  This drainage pipe is carrying considerable rainfall runoff from
                                        the residential and commercial areas to the north and west of
                                        the State Highway 26 / Grapevine Highway and Hurst view /
                                        Norwood Drive intersection. Maintaining this storm drain is
                                        critical for the commercial/retail property on Grapevine
                                        Highway in this area.
              This project consists of repairs to joints,   This project is necessary to improve traffic flow along Pipeline  This project is currently in the   TBD
              substructure point repairs, spalled surface   Road. This project will include the results of the redevelopment planning phase.
              concrete, and the concrete railings.  efforts and zoning overlay for the area east of Precinct Line
                                        Road.  Tarrant County has pledged to participate in 50% of the
                                        construction cost.