WATER AND SEWER BOND FUND
                                                     FUNDED PROJECTS


                                                                                                    Operating Impact
                        Project Description                Project Justification     Status 09/30/18
                                                                                                       9/30/18
             This project will widen Pipeline Road from Precinct Line   This project is necessary to improve traffic flow along   Construction began   O&M impact due to
             Road to the east city limits. Many of the intersections   Pipeline Road. This project will include the results of   during the 2016-2017   reduced maintenance
             have been widened in preparation for this project.  the redevelopment efforts and zoning overlay for the   budget year and is   costs with
                                                 area east of Precinct Line Road.  Tarrant County has   estimated to be   construction of new
                                                 pledged to participate in 50% of the construction cost.  complete somtime   street.
                                                                                   during fiscal year 2018-
                                                                                   2019.


             Hurst has numerous water and sewer mains that lie   TxDOT requires that all utilities that lie beneath   The expenditures to   TBD
             behind the existing curb on State Highway 26, which   existing or proposed pavement and parallel the road   date represent
             must be relocated to lie behind the new curb.  The   must be relocated to lie behind the proposed curb.    planning efforts.
             relocation of any utilities that lie in an easement will be   TxDOT will reimburse the City for any utility that lies in
             paid by TxDOT.                      an easement that must be relocated.
             This project will consist of installing a control system at   When low chlorine residual readings occur, staff has to  Engineering Contract   O&M impact due to
             the base of the tank that will automatically sense the   try and cycle the water out of the elevated storage tank  was approved by   lower maintenance
             chlorine residual level in the Precinct Line Road   in order to get fresher water with some chlorine   council in July 2018.    costs with new control
             Elevated Storage Tank and appropriately dose the water  residual into the tank.  Sometimes fire hydrants near   Construction to begin   system.
             through an automated chemical feed system to increase  the tank are flushed in order to pull the fresher water   in early 2018-2019.
             the chloramine level in the tank.  This will maintain a   into the tank area.  This is controlled water loss to the
             minimum residual chlorine level where there has been   City's system, but is loss revenue.  With the installation
             low readings numerous times in the past.  of the automated sensor and chemical feed system,
                                                 water loss due to low residuals should be minimized.
                                                 The estimated cost for the system installation is
                                                 $350,000


             The sanitary sewer replacement project involves the   The Wastewater Collection Division has identified   This project is in the   O&M impact due to
             replacement or rehabilitation of deteriorating or   these mains to allow excessive inflow and infiltration   Engineering phase   lower maintenance
             undersized 15" sanitary sewer trunk mains with a 24"   (I&I) during rain events, causing customer sewer   and construction is   costs with new water
             trunk main.                         backups.                          scheduled to begin   and sewer lines.
                                                                                   during the 2018-2019
                                                                                   fiscal year.