Page 494 - Bedford-FY25-26 Budget
P. 494

Public Works Requests


              Itemized Requests for 2026

              Brown Trail Street Improvements                                                           $6,826,619
              Reconstruction and improvements of Brown Trail between Pipeline and Bedford Road as part of the Tarrant County 2021
              Transportation Bond Program.

              Gregory and Bedford Court Addition Utility and Street Improvements                        $4,232,909
              Improvements to sanitary sewer and streets.

              Martin & Harwood Waterline Replacement                                                     $2,535,617
              This project includes waterline replacement along Harwood Road and Martin Drive.

              Ravenswood & Bedford Road Drainage Improvement                                             $850,000
              Extend the Drainage system under Ravenswood Drive to and across Bedford Road addressing local drainage issues and
              improving motorist and pedestrian safety by collecting storm water into storm drain inlets at each of the four corners of
              the...


                                                                                                Total:  $14,445,145





             Parks Requests

              Itemized Requests for 2026

              Generations Park Lake Pavilion - Roof Gutters and Downspouts                                 $7,600
              Installation of roof gutters and downspouts at the Generations Park lake pavilion to help address ongoing issues with soil
              erosion,  ooding of interior facilities, and turf damage.  Please note that due to potential price increases...

              John Deere 1200A Bunker and Field Rake                                                       $23,566
              The John Deere 1200A Bunker and Field Rake is a versatile piece of turf equipment designed to ef ciently maintain sports
               elds and other  ne turf areas.With the addition of three new ball elds at Generations Park, the Honda four-wheeler...

              SCAG Tiger CAT 52" Zero Turn Mower                                                           $13,414
              The SCAG Tiger CAT 52" zero-turn mower is a professional-grade, powerful, and reliable lawn mower designed for both
              residential and commercial use.The SCAG Tiger CAT will replace a 2019 Husqvarna MZ54 zero-turn mower with 1,027 hours
              of operation....

              SCAG Turf Storm XL and Associated Turf and Weed Management Chemicals                         $16,457
              The SCAG Turf Storm XL is a stand-on spreader/sprayer designed for ef cient and large-scale lawn care applications. It
              features a 220-pound granular hopper capacity and a 60-gallon liquid spraying capacity.  With this unit, we will have...

                                                                                                    Total:  $61,037















                City of Bedford, TX | Proposed Budget FY 2025-2026                                         Page 494
   489   490   491   492   493   494   495   496   497   498   499