Page 498 - Bedford-FY25-26 Budget
P. 498

Public Works Requests


             Itemized Requests for 2026-2036

             Brown Trail Street Improvements                                                            $6,826,619
              Reconstruction and improvements of Brown Trail between Pipeline and Bedford Road as part of the Tarrant County 2021
              Transportation Bond Program.

             Drainage - Sulphur Branch Channel Improvements SH 183 to Bedford Road                     $2,280,000
              Drainage - Sulphur Branch Channel Improvements SH 183 to Bedford Road

             Drainage - Erosion Control Sulphur Branch & Sulphur Branch Tributary, Second Phase of Brookhollow Park  $2,280,500
              A section of the concrete channel wall adjacent to Brookhollow Park, from Rankin Drive to the pedestrian bridge, collapsed
              in February 2018 during heavy rainstorms. Various other sections were also compromised. The project consists of the...

             Drainage - Sulphur Branch Tributary Culvert Improvements at Bridges (Briar Drive, Shirley Way, Circle Lane,  $655,000
             Schumac Lane, and Donna Lane)
              Culvert improvements at bridge headwalls on Briar Drive, Shirley Way, Circle Lane, Schumac Lane, and Donna Lane. Briar -
              Design ($35,000 in FY 27), Construction ($260,000 in FY 29); Shirley - Design ($40,000 in FY 28), Construction...

             Gregory and Bedford Court Addition Utility and Street Improvements                        $4,232,909
              Improvements to sanitary sewer and streets.

             Martin & Harwood Waterline Replacement                                                     $2,535,617
              This project includes waterline replacement along Harwood Road and Martin Drive.
             Ravenswood & Bedford Road Drainage Improvement                                              $850,000
              Extend the Drainage system under Ravenswood Drive to and across Bedford Road addressing local drainage issues and
              improving motorist and pedestrian safety by collecting storm water into storm drain inlets at each of the four corners of
              the...

                                                                                                Total:  $19,660,645


            Parks Requests


             Itemized Requests for 2026-2036
             Generations Park Lake Pavilion - Roof Gutters and Downspouts                                  $7,600
              Installation of roof gutters and downspouts at the Generations Park lake pavilion to help address ongoing issues with soil
              erosion,  ooding of interior facilities, and turf damage.  Please note that due to potential price increases...
             John Deere 1200A Bunker and Field Rake                                                       $23,566
              The John Deere 1200A Bunker and Field Rake is a versatile piece of turf equipment designed to ef ciently maintain sports
               elds and other  ne turf areas.With the addition of three new ball elds at Generations Park, the Honda four-wheeler...
             SCAG Tiger CAT 52" Zero Turn Mower                                                            $13,414
              The SCAG Tiger CAT 52" zero-turn mower is a professional-grade, powerful, and reliable lawn mower designed for both
              residential and commercial use.The SCAG Tiger CAT will replace a 2019 Husqvarna MZ54 zero-turn mower with 1,027 hours
              of operation....

             SCAG Turf Storm XL and Associated Turf and Weed Management Chemicals                         $16,457
              The SCAG Turf Storm XL is a stand-on spreader/sprayer designed for ef cient and large-scale lawn care applications. It
              features a 220-pound granular hopper capacity and a 60-gallon liquid spraying capacity.  With this unit, we will have...


                                                                                                    Total:  $61,037



                City of Bedford, TX | Proposed Budget FY 2025-2026                                         Page 498
   493   494   495   496   497   498   499   500   501   502   503