Library Requests



             Itemized Requests for 2025-2035

             Roof Replacement                                                                            $250,000
              During construction in 2010, the Library received a new white roof with the help of a $201,000 Department of Energy grant.
              The roof has a 20-year warranty. The average lifespan of a roof is 20 - 25 years.

             Solar Panel System Replacement                                                              $750,000
              In 2009, the State Energy and Conservation Of ce (SECO) awarded the City of Bedford with a $1.9 million dollar grant to
              install 824 solar panels at the site of the new Library. The Library photovoltaic system produces an estimated...


             Staff Area Carpet Replacement                                                                $ 40,000
              The staff area carpet was installed in 2011. Although the Library has replaced public area  ooring due to heavy usage, the
              staff area carpet has never been replaced and will be 17 years old.


                                                                                                 Total:  $1,040,000


            Police Requests



             Itemized Requests for 2025-2035

             Armor y Remodel                                                                              $28 ,500
              Paint walls, ceiling grid, and door; Ceramic tile  oor and base; New 2'x2' LED lighting; New ceiling tile; 20' laminate
              upper/lower cabinets w/locks; Under cabinet lighting; Stainless steel counter...

             K-9 Holding Area - Remodeling                                                                 $7,500
              Paint walls, ceiling grid, and door; Seal concrete; Install new 2'x2' LED lights; New ceiling tile; New chain link 6'x4'
              kennel; Secured cabinetry/storage


             Quar termaster Storage and Distribution Space                                                $80,000
              Renovate current workout room into a space for the Quartermaster storage and distribution area.


             SWAT Room Remodel                                                                            $24 , 300
              Paint walls, ceiling grid, and door; Ceramic tile  oor and base; Installation of new lighting (2'x2'); Installation of new ceiling
              tile; Installation of ten (10) lockers each w/electricity and shelf (1)

             Technology Upgrade to the Mobile Command Post (MCP)                                         $837,192
              The Mobile Command Post (MCP) was purchased in 2003 and is jointly owned by the police and  re departments. The
              MCP provides a location for the incident commanders to utilize a secured space to carry out command functions during
              large scale or...


                                                                                                  Total:  $977,492